My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-018 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-018 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 4:31:28 PM
Creation date
7/27/2016 3:00:56 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/14/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WSB <br />4111111 Engineering • Planning • Environmental ■ Construction <br />& Associates, Inc. <br />February 18, 2106 <br />City of Lino Lakes <br />Mr. Michael Grochala <br />600 Town Center Parkway <br />Lino Lakes, MN 55014 <br />Re: 2016 Street Maintenance Project <br />Civil Engineering Design Services <br />Dear Mr. Grochala: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We appreciate the opportunity to provide this proposal for civil engineering design services. The <br />City of Lino Lakes is requesting assistance with design of its 2016 Street Maintenance Project. <br />The streets designated for rehabilitation are local streets as determined by their OCI ratings <br />established in the City's Pavement Management Study. This proposal has been broken out for <br />each site. <br />Holly Lane — Full Depth Reclamation <br />The scope of services includes the preparation of construction documents for full depth <br />reclamation of Holly Lane from, Ash Street to Holly Court (approximately 0.67 miles). Our <br />design services include survey of existing conditions, preparation of construction plans, <br />preparation of a project manual (specifications) and assistance with project bidding. The <br />engineering fee to complete the described design services above is $12,500. <br />Holly Court — Mill and Overlay <br />The scope of services includes the preparation of construction documents for mill and overlay of <br />Holly Court from Holly Lane to the existing cul de sac located approximately 0.30 miles east of <br />Holly Lane. Our design services include survey of existing conditions, preparation of <br />construction plans, preparation of a project manual (specifications) and assistance with project <br />bidding. The engineering fee to complete the described design services above is $6,200. <br />Birch Street — Mill and Overlay <br />The scope of services includes the preparation of construction documents for mill and overlay of <br />Birch Street from Pheasant Run South (Saddle Club) north to the proposed cul de sac located at <br />CSAH No. 34 (approximately 0.25 miles). Our design services include survey of existing <br />Minneapolis • St Cloud <br />Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.