Laserfiche WebLink
Project: 02988-14 - 2016 Mill and Overlay Improvement Project Line No. <br />Engineers Estimate <br />Northwest Asphalt, Inc. <br />North Valley, Inc. <br />FPI Paving Contractors <br />Item <br />Units <br />Quantity <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />Unit Price <br />Total Price <br />SCHED LE A - HOLLY DRIVE <br />1 <br />2021.501 <br />MOBILIZATION (5%) <br />LUMP SUM <br />1 <br />$11,000.00 <br />$11,000.00 <br />$10,000.00 <br />$10,000.00 <br />$37,635.43 <br />$37,635.43 <br />$11,000.00 <br />$11,000.00 <br />2 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />L F <br />80 <br />$10.00 <br />$800.00 <br />$10.00 <br />$800.00 <br />$29.74 <br />$2,379.20 <br />$18.50 <br />$1,480.00 <br />3 <br />2104.505 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />S Y <br />200 <br />$5.00 <br />$1,000.00 <br />$5.00 <br />$1,000.00 <br />$4.25 <br />$850.00 <br />$6.00 <br />$1,200.00 <br />4 <br />2104.509 <br />REMOVE MAIL BOX SUPPORT <br />EACH <br />2 <br />$50.00 <br />$100.00 <br />$50.00 <br />$100.00 <br />$91.40 <br />$182.80 <br />$80.00 <br />$160.00 <br />5 <br />2104.513 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />250 <br />$5.00 <br />$1,250.00 <br />$2.50 <br />$625.00 <br />$3.60 <br />$900.00 <br />$3.75 <br />$937.50 <br />6 <br />2104.602 <br />SALVAGE AND REINSTALL MAILBOX <br />EACH <br />11 <br />$100.00 <br />$1,100.00 <br />$90.00 <br />$990.00 <br />$134.41 <br />$1,478.51 <br />$95.00 <br />$1,045.00 <br />7 <br />2105.604 <br />GEOTEXTILE FABRIC TYPE IV <br />S Y <br />40 <br />$5.00 <br />$200.00 <br />$2.50 <br />$100.00 <br />$2.38 <br />$95.20 <br />$3.50 <br />$140.00 <br />8 <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />HOUR <br />10 <br />$150.00 <br />$1,500.00 <br />$100.00 <br />$1,000.00 <br />$123.66 <br />$1,236.60 <br />$155.00 <br />$1,550.00 <br />9 <br />2130.501 <br />WATER <br />MGAL <br />10 <br />$50.00 <br />$500.00 <br />$50.00 <br />$500.00 <br />$37.64 <br />$376.40 <br />$55.00 <br />$550.00 <br />10 <br />2211.501 <br />AGGREGATE BASE CLASS 5 <br />TON <br />1100 <br />$20.00 <br />$22,000.00 <br />$11.70 <br />$12,870.00 <br />$12.65 <br />$13,915.00 <br />$21.50 <br />$23,650.00 <br />11 <br />2221.501 <br />AGGREGATE SHOULDERING CLASS 5 <br />TON <br />230 <br />$10.00 <br />$2,300.00 <br />$24.75 <br />$5,692.50 <br />$20.71 <br />$4,763.30_ <br />$30.00 <br />$6,900.00 <br />12 <br />2232.501 <br />MILL BITUMINOUS SURFACE <br />S Y <br />350 <br />$2.00 <br />$700.00 <br />$5.00 <br />$1,750.00 <br />$5.22 <br />$1,827.00 <br />$10.00 <br />$3,500.00 <br />13 <br />2331.601 <br />BITUMINOUS PAVEMENT RECLAMATION <br />SQ YD <br />9300 <br />$2.00 <br />$18,600.00 <br />$1.39 <br />$12,927.00 <br />$2.08 <br />$19,344.00 <br />$1.85 <br />$17,205.00 <br />14 <br />2357.502 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GALLON <br />550 <br />$4.00 <br />$2,200.00 <br />$2.50 <br />$1,375.00 <br />$3.05 <br />$1,677.50 <br />$1.85 <br />$1,017.50 <br />15 <br />2360.501 <br />TYPE SP 9.5 WEARING COURSE MIX (2,C) <br />TON <br />_ 920 <br />$64.00 <br />$58,880.00 <br />$62.15 <br />$57,178.00 <br />$62.17 <br />$57,196.40 <br />$70.00 <br />$64,400.00 <br />16 <br />2360.502 <br />TYPE SP 12.5 NON WEAR COURSE MIX (2,C) <br />TON <br />1250 <br />$62.00 <br />$77,500.00 <br />$60.90 <br />$76,125.00 <br />$60.91 <br />$76,137.50 <br />$68.00 <br />$85,000.00 <br />17 <br />2360.503 <br />TYPE SP 9.5 WEARING COURSE MIX (2,C) 3.0" THICK <br />SQ YD <br />500 <br />$45.00 <br />$22,500.00 <br />$27.50 <br />$13,750.00 <br />$22.64 <br />$11,320.00 <br />$30.00 <br />$15,000.00 <br />18 <br />2501.511 <br />"12"" CS PIPE CULVERT" <br />L F <br />60 <br />$30.00 <br />$1,800.00 <br />$30.00 <br />$1,800.00 <br />$71.38 <br />$4,282.80 <br />$28.00 <br />$1,680.00 <br />19 <br />2501.511 <br />18" CS PIPE CULVERT <br />LIN FT <br />80 <br />$42.00 <br />$3,360.00 <br />$35.00 <br />$2,800.00 <br />$111.83 <br />$8,946.40 <br />$32.50 <br />$2,600.00 <br />20 <br />2501.515 <br />"12"" CS PIPE APRON" <br />EACH <br />4 <br />$250.00 <br />$1,000.00 <br />$160.00 <br />$640.00 <br />$211.76 <br />$847.04 <br />$215.00 <br />$860.00 <br />21 <br />2501.515 <br />18" CS PIPE APRON <br />EACH <br />4 <br />$350.00 <br />$1,400.00 <br />$195.00 <br />$780.00 <br />$723.30 <br />$2,893.20 <br />$225.00 <br />$900.00 <br />22 <br />2511.501 <br />RANDOM RIPRAP CLASS III <br />CU YD <br />24 <br />$150.00 <br />$3,600.00 <br />$100.00 <br />$2,400.00 <br />$113.02 <br />$2,712.48 <br />$125.00 <br />$3,000.00 <br />23 <br />2540.602 <br />INSTALL MAIL BOX SUPPORT <br />EACH <br />2 <br />$100.00 <br />$200.00 <br />$90.00 <br />$180.00 <br />$161.30 <br />$322.60 <br />$95.00 <br />$190.00 <br />24 <br />2540.602 <br />MAIL BOX (TEMPORARY) <br />EACH <br />11 <br />$50.00 <br />$550.00 <br />$50.00 <br />$550.00 <br />$37.64 <br />$414.04 <br />$55.00 <br />$605.00 <br />25 <br />2563.601 <br />TRAFFIC CONTROL <br />_LS <br />1 <br />$2,500.00 <br />$2,500.00 <br />$31,100.00 <br />$31,100.00 <br />$1,182.83 <br />$1,182.83 <br />$1,500.00 <br />$1,500.00 <br />26 <br />2573.540 <br />FILTER LOG TYPE WOOD FIBER BIOROLL <br />LIN FT <br />6000 <br />$4.00 <br />$24,000.00 <br />$3.15 <br />$18,900.00 <br />$2.58 <br />$15,480.00 <br />$2.50 <br />$15,000.00 <br />27 <br />2573.603 <br />SILT FENCE TYPE MACHINE SLICED <br />LIN FT <br />1000 <br />$2.75 <br />$2,750.00 <br />$2.15 <br />$2,150.00 <br />$2.42 <br />$2,420.00 <br />$2.50 <br />$2,500.00 <br />28 <br />2575.502 <br />SEED MIXTURE 25-151 <br />LB <br />200 <br />$5.00 <br />$1,000.00 <br />$4.00 <br />$800.00 <br />$3.49 <br />$698.00 <br />$3.50 <br />$700.00 <br />29 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 3 <br />SQ YD <br />200 <br />$4.00 <br />$800.00 <br />$4.00 <br />$800.00 <br />$1.88 <br />$376.00 <br />$1.85 <br />$370.00 <br />30 <br />2575.605 <br />SEEDING (INCL. SEED, FERT, MULCH, DISC ANCHOR) <br />ACRE <br />1.5 <br />$2,500.00 <br />$3,750.00 <br />$8,000.00 <br />$12,000.00 <br />$2,865.67 <br />$4,298.51 <br />$2,900.00 <br />$4,350.00 <br />31 <br />2582.502 <br />"4"" DBLE SOLID LINE PAINT" <br />L F <br />3400 <br />$1.00 <br />$3,400.00 <br />$0.30 <br />$1,020.00 <br />$0.32 <br />$1,088.00 <br />$0.50 <br />$1,700.00 <br />Total SCHEDULE A - HOLLY DRIVE: <br />$272,240.00 <br />$272,702.50 <br />$277,276.74 <br />$270,690.00 <br />SCHEDULE B - HOLLY COURT <br />32 <br />2021.501 <br />MOBILIZATION (5%) <br />LUMP SUM <br />1 <br />$2,000.00 <br />$2,000.00 <br />$2,000.00 <br />$2,000.00 <br />$1,612.95 <br />$1,612.95 <br />$2,750.00 <br />$2,750.00 <br />