My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-058 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-058 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 10:18:37 AM
Creation date
7/28/2016 8:35:53 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
06/27/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
property, or the general welfare because of excessive production of traffic, noise, <br />smoke, fumes, glare, or odors. <br />The proposed temporary batch plant will not be detrimental to any persons or property. <br />Transportation haul routes and signage shall be utilized to provide traffic control at <br />Phelps Road and Otter Lake Road. <br />9. The proposed development will not result in the destruction, loss, or damage of a <br />natural, scenic or historic feature of major importance. <br />The proposed temporary batch plant will not result in the destruction, loss or damage of <br />natural, scenic or historic features. The existing wetlands and public ditch system will not <br />be affected by the activities. No scenic or historic features exist in the area. <br />Per Section 1007.046, Batch Plants: <br />(3) Requirements. In addition to the General Standards contained within §1007.017, <br />Temporary Batch Plants are also required to comply with the following conditions <br />and performance standards in order to obtain an Interim Use Permit: <br />(a) The Batch Plant shall be located on the site so as to minimize the disturbance <br />of surrounding dwelling units or commercial businesses. <br />Arnt Construction currently operates their road construction/excavation business and <br />stockpiles construction materials on the subject site. The surrounding properties are <br />guided for industrial use. The current construction operation and proposed temporary <br />batch plant are consistent with industrial users. <br />(b) The Batch Plant shall maintain a 50 foot setback from any wetland. <br />The temporary batch plant is located over 160 feet from any potential wetlands. <br />(c) The project intended to be served by the batch plant and a deadline for <br />removal shall be clearly defined. <br />The temporary batch plant will be used by PCI Roads, LLC for a MN/DOT I -35E project. <br />Operations shall not exceed 4 weeks from date of set up and all equipment shall be <br />removed by November 30, 2016. <br />(d) The Hours of Operation shall be clearly defined. <br />Hours of operation shall be consistent with Section 901.03(4)(b): <br />7:00 a.m. to 7:00 p.m. <br />Monday through Friday <br />9:00 a.m. to 5:00 p.m. <br />Saturday <br />No construction activity allowed <br />Sunday and federal holidays <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.