Laserfiche WebLink
B. Cost Estimates. The Developer shall provide the City with a written <br />estimate of all applicable costs of the On -Site Work, itemized by type; the <br />estimates shall be based upon the actual estimates provided by the <br />contractors who are to do the Work. Said cost estimates shall be reviewed <br />by the City, and the City shall establish the actual amount of the financial <br />guarantee. The description and estimated cost of Developer's On-site <br />Work are as follows: <br />Description of Improvements Estimated Costs <br />1. Traffic Control $8,500 <br />2. Erosion Control $3,000 <br />3. Roadway Repair $14,500 <br />4. Restoration $3,000 <br />Total Estimated Cost of Developer $29,000 <br />Improvements <br />Security Requirement (Total * 35%) $10,150 <br />III. RECORD DRAWINGS <br />Record drawings are not required for this project. Once the project is <br />complete the applicant shall notify the City Engineer for a final site <br />approval. <br />IV. COMPLETION DATE. <br />The project shall be completed by November 30, 2016 including site <br />restoration. <br />V. GUARANTEE. <br />A. The Developer will fully and faithfully comply with all terms and <br />conditions of any and all contracts entered into by the Developer. <br />Concurrently with the execution hereof by the Developer, the Developer <br />will furnish to, and at all times thereafter maintain with the City, a cash <br />deposit, certified check, or Irrevocable Letter of Credit, based on thirty- <br />five (35%) percent of the total estimated cost of Developer's On-site <br />Work. An Irrevocable Letter of Credit shall be for the exclusive use and <br />benefit of the City of Lino Lakes and shall state thereon that the same is <br />issued to guarantee and assure performance by the Developer of all the <br />terms and conditions of this Development Contract, construction of all <br />required improvements in accordance with the ordinances and <br />specifications of the City and guarantees the workmanship and materials <br />for the site restoration for a period of one year following the City's <br />2016 20160627 Arnt CUP Batch Plant Site Performance Agreement page 2 of 8 <br />