My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-065 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-065 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 10:17:29 AM
Creation date
7/28/2016 8:55:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
07/11/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 11 Future Single Family Units (future development of existing home) <br />• 88 unit multi -family <br />• 315 TOTAL UNITS <br />This review is based on the NorthPointe 4th Addition Sanitary Sewer, Watermain, Storm Sewer <br />and Street Construction Plans dated May 12, 2016 and final plat received on June 23, 2016 and <br />prepared by Carlson McCain. <br />Previous Council Actions: <br />• March 10, 2014: NorthPointe PUD Development Stage Plan/Preliminary Plat, <br />Resolution No. 14-21 <br />• June 23, 2014: NorthPointe PUD Final Plan -Final Plat, Resolution No. 14-47 <br />• September 22, 2014: NorthPointe 2nd Addition Final Plat, Resolution No. 14-105 <br />• August 24, 2015: NorthPointe 3rd Addition Final Plat, Resolution No. 15-86 <br />ANALYSIS <br />Subdivision Ordinance <br />Conformity with the Comprehensive Plan and Zoning Code <br />The PUD Final Plan/Final Plat has been reviewed for compliance with the comprehensive plan, <br />zoning and subdivision ordinance. The proposed development is not considered premature and <br />meets the performance standards of the subdivision and zoning ordinance. The PUD Final <br />Plan/Final Plat is consistent with the PUD Development Stage Plan/Preliminary Plat. <br />There is a modification from the phasing plan. The phasing plan dated August 26, 2015 for <br />Phase IV was for 51 lots and included dedication of the parkland. The proposed NorthPointe <br />4th Addition final plat is for 31 lots and includes dedication of the parkland. The phasing plan <br />shall be revised accordingly. <br />Blocks and Lots <br />The final plat for NorthPointe 4th Addition creates 31 lots and 4 outlots. Outlots A, B and C are <br />for future development, stormwater management and wetland protection areas. Outlot D is for <br />parkland. <br />There is one slight revision to the final plat as presented to the Planning & Zoning Board on <br />June 8th. Wetlands were incorrectly shown on Outlot A, NorthPointe 4th Addition. They have <br />already been mitigated and do not exist. The revised final plat correctly shows no wetland on <br />that outlot. <br />Streets <br />The following right-of-way and street widths were approved with Resolution No. 14-21, PUD <br />Development Stage Plan/Preliminary Plat: <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.