Laserfiche WebLink
Building a legacy – your legacy. 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis, MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> <br /> <br />Equal Opportunity Employer <br /> wsbeng.com \\mspfsv02.lps.local\Studios\Active Projects\CLL16007 - Clearwater Creek Business Park in Lino Lakes MN\From Others (Original Data)\20160628 Engineering Review Lino Lakes-CCBP.docx <br />Memorandum <br /> <br />To: Katie Larsen, City Planner <br /> <br />From: Diane Hankee PE, City Engineer <br /> <br />Date: June 28, 2016 <br /> <br />Re: Clearwater Creek Business Park <br />Plan Review for AUAR Conformance <br /> WSB Project No. 2029-820 <br /> <br /> <br />We have reviewed the plans for Clearwater Creek Business Park in Lino Lakes, MN prepared by <br />Plowe Engineering, Inc. received on June 17, 2016 for conformance with the AUAR. <br /> <br />For reference please see notes on the Mitigation checklist enclosed, along with the following <br />comments. <br /> <br />FISH, WILDLIFE, ECOLOGICALLY SENSITIVE RESOURCES <br /> <br />1. AUAR Mitigation Item 11.1. The AUAR highlights this area as part of the Conservation <br />Design Framework (CDF) with a future greenway corridor and trail from Cedar Street <br />north through the property. Clearwater Creek (JD3) is located within the parcel and a 100 <br />foot buffer is recommended per the mitigation plan. This measure is satisfied by the <br />creation of a natural corridor running parallel with the creek. <br />• A 50 foot conservation easement is proposed on Outlot A measured from the <br />centerline of the ditch. This should be adjusted to measure 50 feet from the <br />Top of Bank. Additional protections may be considered with future <br />development of this lot. <br />• Lot 1, which is being developed, establishes a buffer along the creek ranging <br />from 20’ in the far NE corner of the lot to over 150 feet in width along the <br />length of the creek. The area is further buffered by the construction of <br />stormwater management ponds between the buffer area and site parking <br />areas. The proposed conservation easement should be modified to include all <br />the area between the creek, stormwater ponds and parking area. <br />• A trail will be constructed along 21st Avenue with the future extension of 21st <br />Avenue to Cedar Street. <br />2. AUAR Mitigation Item 11.8. The AUAR requires an eagle nest survey. At the time of <br />the AUAR update (June 2015); the DNR did not have records of any eagle nests within 1 <br />mile of the project area. There are not many trees on the site, but those that are present