My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-25-2016 Council Packet*
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
07-25-2016 Council Packet*
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:07:39 PM
Creation date
8/15/2016 2:35:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/25/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br />The 56.45 acre site is bisected by Judicial Ditch No. 3 (Clearwater Creek), which separates the <br />northern third of the site from the remainder. The creek will be preserved and a conservation <br />easement will be provided to protect this greenway corridor. The buffer along the creek shown <br />on Lot 1 ranges from 20 feet to 150 feet in width and will be provided in a conservation <br />easement. The buffer will include all of the area between the creek, ponds and parking area. The <br />site has a limited number of trees, but many of those are located adjacent to the creek and will be <br />preserved. <br /> <br />4. A creative use of land and related physical development which allows a phased and <br />orderly transition of varying land uses in close proximity to each other. <br /> <br />The project will allow development of a significant distribution center and will provide two <br />outlots for future development. The project includes an extension of 21st Avenue to provide <br />access to Lot 1. The development is consistent with the development anticipated by the <br />Comprehensive Plan, AUAR and Zoning Ordinance. <br /> <br />5. An efficient use of land resulting in smaller networks of utilities and streets thereby <br />lowering development costs and public investments. <br /> <br />The development will include extension of existing streets and trunk utilities, which will be <br />designed and built by the developer. The infrastructure will be planned and built by the <br />developer. <br /> <br />6. Promotion of a desirable and creative environment that might be prevented through the <br />strict application of City zoning and subdivision regulations. <br /> <br />The purpose of the PUD will allow construction of the distribution center on Lot 1 in a location <br />that would not otherwise have been allowed under the standard zoning and subdivision <br />regulations. <br /> <br />BE IT FURTHER RESOLVED by the City Council of The City of Lino Lakes hereby <br />establishes that Clearwater Creek Business Park shall be developed in accordance with the <br />following: <br /> <br />1. The developer is approved to create for one lot and two outlots for “Clearwater Creek <br />Business Park”, in accordance with the plans and application received by the City on <br />May 16, 2016 and the revisions received on June 17, 2016 and July 1, 2016, except as <br />amended by this resolution. <br /> <br />2. The applicant must comply with all conditions in the City Engineer’s memo dated <br />June 2, 2016. <br /> <br />3. The applicant must comply with all conditions in the City Engineer’s AUAR memo <br />dated June 28, 2016. <br /> <br />4. The applicant must comply with the Environmental Board recommendations in the <br />memo dated June 29, 2016. <br /> <br />5. The applicant must obtain approvals from RCWD and must comply with all related
The URL can be used to link to this page
Your browser does not support the video tag.