My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-06-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
09-06-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:03:21 AM
Creation date
9/7/2016 1:00:12 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/06/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WS – Item 2 <br />WORK SESSION STAFF REPORT <br />Work Session Item No. 2 <br /> <br /> <br />Date: September 6, 2016 <br /> <br />To: City Council <br /> <br />From: Diane Hankee <br /> <br />Re: I-35W North Corridor Improvements <br /> <br /> <br />Background <br /> <br />Minnesota Department of Transportation (MnDOT) staff will be in attendance to provide <br />a project overview and an update on the noise wall public process. The project is a <br />combination of two MnDOT projects: <br /> <br />1. Federal project (funding still being allocated): I-35W North Managed Lanes <br />Project MnPass which includes adding a lane, in each direction, on I-35W <br />between Hwy 36 in Roseville and Lexington Avenue (Co Rd 17) in Blaine. <br />When a project is federally funded a noise evaluation is completed and approved <br />improvements are included within the project. <br /> <br />MnDOT constructed a noise wall along the north side of I-35W in 2009. <br />Following its completion the City received a petition from residents requesting a <br />barrier on the south side. Construction of the proposed MnPass project, which <br />includes a noise wall, addresses this request. <br /> <br />MnPass projects do not require municipal consent however MnDOT chose to give <br />Cities the opportunity to collaborate on the proposed layouts. <br /> <br />2. State project: I-35W Resurfacing project from County Road J to 1,600 north of <br />Sunset Avenue. <br /> <br />In an effort to minimize construction impacts to users MnDOT combined the two <br />projects. This will provide one construction contract, one contractor and one <br />mobilization (reduces traffic disruption). <br /> <br />For clarification, the City does not have a cost share requirement with this project. Per <br />MnDOT’s policy on cost shares, if the city requests to have city items added to the <br />project (e.g., signals, roadways, utilities, sidewalks), the City would be responsible for a <br />share these items as outlined in MnDOT’s cost participation policy. There are no city <br />items being proposed. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.