My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-13-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
06-13-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 3:46:27 PM
Creation date
9/7/2016 1:33:13 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/13/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />THEREFORE: <br /> <br />1. The City, at its cost, will inspect and maintain the Facilities delineated and <br />labeled on Exhibit A as follows: <br /> <br />POND B, G1 & G2 <br /> <br />The City will: <br /> <br />a. Obtain certified as-built contours for all ponds and inspect the ponds, <br />and associated outlet structures, culverts and outfall structures one year <br />and two years after the completion of as-builts, including measuring <br />sediment accumulation by a method accurate to within one vertical foot. <br />Thereafter, perform inspections in the fifth year after pond completion <br />and every five years thereafter. If inspections show that sediment may <br />accumulate to 50 percent of wet storage volume, or 25 percent of dry <br />detention volume, within less than five years, the City will inspect more <br />frequently. Pond function will be considered inadequate if sediment <br />accumulation has decreased the wet storage volume by 50 percent or dry <br />detention volume by 25 percent, and the City will restore the basin to its <br />original design elevations and dimensions and restore vegetation in <br />disturbed areas within one year of the inspection date. <br /> <br />b. Inspect stormwater infiltration and filtration basins, including rain <br />gardens, annually, to preserve live storage capacity at or above the <br />design volume. Remove vegetation, maintain healthy plant growth and <br />remove excess sediment and debris to ensure that the Facilities continue <br />to perform per design. <br /> <br />c. Inspect grit chambers, sump catch basins and sump manholes <br />annually. Accumulated sediment and debris will be removed so that the <br />each Facility continues to operate as designed and erosion or structural <br />problems are corrected. <br /> <br />d. Inspect conveyances and other structures annually. Ensure <br />preservation of designed hydraulic capacity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.