My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
08-22-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:02:06 AM
Creation date
9/7/2016 1:39:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />a. The easement appears to be 30 feet in some locations and this shall be <br />revised. <br />b. The easement shall also allow for drainage and utilities. <br />9. A minimum 10 feet of separation shall be required between the proposed trail and <br />the existing driveway at 441 Birch Street. <br />a. The trail appears to be less than 10 feet from the existing driveway in <br />some locations. This shall be revised. <br />10. Due to the unique “boulevard loop”, it is important to note the property owners <br />shall be responsible for mowing and maintaining the right of way boulevard. <br />11. The existing trail along the north side of Birch Street shall be shown on the <br />preliminary plat. <br />12. Details regarding the temporary access to Birch Street for construction traffic <br />shall be provided on the plans and a timeframe for use shall be included. <br />13. Any lot extending into the floodplain shall be required to obtain a FEMA LOMA <br />prior to issuance of a building permit. <br />14. Upon final plat, the applicant shall submit HOA documents detailing the <br />maintenance plan for the infiltration basin in the boulevard loop. <br /> <br />ATTACHMENTS <br /> <br />1. Site Location Map <br />2. City Engineer letter dated July 7, 2016 <br />3. Environmental Coordinator letter dated June 29, 2016 <br />4. Revised civil plans prepared by Plowe Engineering dated June 27, 2016 and <br />received by the City on June 24, 2016 <br />5. Revised preliminary plat plans prepared by EG Rud & Sons dated June 24, 2016 <br />and received by the City on June 24, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.