Laserfiche WebLink
<br /> <br /> <br />I <br />:c <br />- I <br />l 1-35W NORTH PROJECT SCOPE i <br /> <br /> <br /> <br /> <br />Old Highway 8-- -- <br />Stti Avenue <br />Railroad <br />Bridge <br /> <br /> <br />County Road 88 2 County Road 10 x <br /> <br /> <br /> <br />t:::::1 County Road 46 <br />(Cleveland Avenue) <br /> <br />County Road B2 County Road C County Road D <br />(Terminal Road) (City Centre Drive) <br />County Road E2 County Road F <br />(5th Street) (Lake Valentine Road I <br />County Road 96 County Road H <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />c <br />Cl "C <br /> <br /> <br /> I "C !! .!! !! c. <br />01 <br /> <br />c. <br />j <br />i E ll .i::. 0 <br />..,,I c ll E ll 0 c m .i::. c <br />Ill <br />0en0 <br />Lt) <br />., m <br />I NOTES: <br />- ADD ONE LANE IN EACH DIRECTION IN THE MIDDLE, <br />WHICH WILL BE A MNPASS LANE, FROM CR C TO LEXINGTON AVE. <br /> - ORANGE INDICATES BRIDGES THAT WILL BE REPLACED (FOUR AT CR C AND ONE AT CR I) ALL OTHER BRIDGES WILL BE LEFT AS-I S. <br />- ALL LANES PAVED WITH CONCRETE FROM CR C TO SUNSET AVE. <br />- APPROXIMATE COST $208 MILLION - ESTIMATE CONSTRUCTI ON START IN SPRING 2019. <br />- ADD LANES ON OUTSIDE AS SHOWN IN BLUE. <br /> <br /> <br />From Park & Ride <br />County Ditch 53-62 <br /> <br /> <br /> <br /> <br />County Road 17 <br />5 County Road H <br />::!: <br />:r': <br />...... <br />County Road I County Road J <br />(85th Avenue) <br />County Road 23 County Road 52 <br />(Lake Drive) (95th Avenue) <br />(Lexington Avenue) <br /> <br /> <br /> <br /> <br />"[ Con1ulting Group, Jnc. <br />D.. ":"'. <br />:r: -- --