My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-22-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
08-22-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:02:06 AM
Creation date
9/7/2016 1:39:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/22/2016
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6A <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br /> <br />MEETING DATE: August 22, 2016 <br /> <br />TOPIC: Public Hearing. Consider Resolution No. 16-80, Approving <br />Municipal Consent, I-35W North Corridor Improvements <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Council is to consider approving municipal consent for the Interstate 35W North Corridor <br />improvement project. <br /> <br />BACKGROUND <br /> <br />Project Purpose <br />MnDOT has identified a number of factors justifying the need for the I-35W North Corridor <br />Project. These factors include pavement conditions, mobility, travel time reliability, and transit <br />and carpool advantages. <br /> <br />The purpose of this project is to provide a long-term, sustainable option for all highway users <br />(transit and non-transit) that improves pavement conditions, increases mobility, improves travel <br />time reliability, and maintains or improves transit advantages. <br /> <br />Project Description <br />MnDOT is designing a road project that includes adding a lane, in each direction, to I-35W <br />between Hwy 36 in Roseville and Lexington Ave. (Co Rd 17) in Blaine. All of the freeway <br />pavement will be repaved with concrete from Hwy 36 in Roseville to 0.1 mile north of Sunset <br />Ave (CR 53) in Lino Lakes, and MnDOT is also analyzing the need and locations for building <br />noise walls along the interstate within these limits. <br /> <br />Planned Project Schedule <br />The proposed project schedule is: <br />• August 2018: Project Letting. <br />• September 2018: Minor construction begins with limited lane closures and minor traffic <br />impacts. <br />• April 2019: Major construction begins with major lane and ramp restrictions and major <br />traffic impacts. <br />• November 2023: Construction is completed. <br /> <br />City’s Estimated Project Costs <br />At this time, the City does not have any cost participation in this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.