Laserfiche WebLink
2 <br /> <br />shall be performed by Lino Lakes. Centerville shall have the right to review and <br />approve the final plans and specifications for the Project prior to commencement <br />of work, and has the right to inspect, review and comment upon Project <br />construction. <br />3. Storm Sewer. Each city shall own the storm sewer lines within its respective <br />corporate boundaries. The city responsible for maintenance of storm water <br />utilities on a particular segment of 21st Avenue, as provided below, is hereby <br />granted an easement by the other city for all lines and related storm water ponds <br />within the other city. Maintenance of the storm water system is divided as <br />follows: <br />a. From Main Street to 600 feet South of Main Street: Lino Lakes. <br />b. From 600 feet south of Main Street to 1,400 feet south: Centerville. <br />c. From 1,400 feet south of Main Street to the temporary cul-de-sac: Lino <br />Lakes. <br />A diagram of the storm sewer system and the responsible parties is attached as <br />Exhibit A. <br />4. Sanitary Sewer. The sanitary sewer lines shall be maintained by the city in which <br />the respective lines are located, except as hereafter noted. Lino Lakes <br />acknowledges that its sanitary sewer line underlying 21st Avenue is on or near the <br />corporate boundary. To the extent any portion of the sanitary sewer line crosses <br />into Centerville, the line remains the property of Lino Lakes. In the event <br />maintenance of the sewer line disturbs that portion of 21st Avenue within <br />Centerville, Lino Lakes is responsible for repairing the street by commercially <br />acceptable means. <br />5. Street Maintenance. <br />a. Lino Lakes, at its expense, shall perform annual street sweeping, pothole <br />filling, snow plowing and winter sanding/de-icing for the segment of 21st <br />Avenue south of Commerce Drive. <br />b. Centerville, at its expense, shall perform annual street sweeping, pothole <br />filling, snow plowing and winter sanding/de-icing for the segment of 21st <br />Avenue north of Commerce Drive and south of Main Street. <br />c. Lino Lakes and Centerville will crack fill and sealcoat 21st Avenue south of <br />Main Street on a 5-7 year interval by separate cost share agreement. <br />d. Other projects, such as reconstruction and overlays, shall be completed by <br />separate agreement between the cities.