Laserfiche WebLink
<br />CITY COUNCIL <br />AGENDA ITEM 6Di <br /> <br /> <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br /> <br />MEETING DATE: September 26, 2016 <br /> <br />TOPIC: Consider Resolution No. 16-113, Accepting bids and Awarding a <br />Construction Contract, 2016 Aqua Lane to Black Duck Drive <br />Trunk Water Main Project <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Staff is requesting council authorization to accept bids and award construction contract for the <br />2016 Aqua Lane to Black Duck Drive Trunk Water Main Project contract. <br /> <br />BACKGROUND <br /> <br />The 2016 Aqua Lane to Black Duck Drive Trunk Water Main Project includes the following: <br /> <br />• Base Bid - A 12 inch diameter trunk water main directionally drilled from Aqua Lane to <br />Black Duck Drive. This improvement provides a secondary line to serve the northwest <br />portion of the City, and it loops the City’s system improving pressure and flow. <br />• Base Bid - A 3 inch diameter sanitary sewer forcemain directionally drilled from the <br />intersection of West Shadow Lake Drive and Sandpiper Drive to Black Duck Drive. <br />This utility is being installed for future extension down West Shadow Lake Drive. <br />• Alternate - A 12 inch diameter trunk water main from Well No. 6 to Birch Street. The <br />water main is being extended to strengthen the system. <br /> <br />Bids were received for the above-referenced project on Monday, September 19, 2016. A total <br />of four bids were received. The bids were checked for mathematical accuracy and tabulated. <br /> <br />CONTRACTOR BASE BID ALTERNATE TOTAL BID <br />GM Contracting, Inc. $ 959,353.78 $118,196.04 $1,077,549.82 <br />Kuechle Underground $1,020,229.00 $122,842.01 $1,143,071.01 <br />Northdale Const. Co., Inc. $1,069,087.72 $144,136.88 $1,213,224.60 <br />A-1 Excavating, Inc. $1,078,875.00 $150,050.00 $1,320,425.00 <br /> <br />The low bid was submitted by GM Contracting, Inc., Lake Crystal, Minnesota, in the amount of <br />$1,077,549.82. The estimated total project cost including construction contingency, engineering, <br />legal and bonding is $1,380,000.00. <br /> <br />The completion date for this project is December 15, 2016.