My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-10-2016 Council Packet (2)
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
10-10-2016 Council Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:35:19 AM
Creation date
1/6/2017 1:26:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/10/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL SPECIAL WORK SESSION September 26, 2016 <br />DRAFT <br /> 2 <br />Item 6B – Planner Larsen explained the addition of an audio/control room planned by 46 <br />Eagle Brook Church. There were no issues presented in the advisory board process. 47 <br /> 48 <br />Item 6C – WSB Engineer Brian Bourassa noted the history of the project before the 49 <br />council. The developer would like to get moving and that is purpose of requesting a 50 <br />grading only permit. Council Member Manthey received a confirmation that there is 51 <br />enough funding escrowed to take care of any potential problems. 52 <br /> 53 <br />Item 6D – WSB Engineer Brian Bourassa reviewed the bid results for the water main 54 <br />project and also showed a drawing of the project area. The second part of the action 55 <br />relates to a construction services contract for administration and other monitoring of the 56 <br />project. 57 <br /> 58 <br />Item 6G – WSB Engineer Brian Bourassa briefly reviewed the final pay request for the 59 <br />original project and alternate. The cost did run high because of an error by the engineer 60 <br />and some funds were contributed by WSB as a result. It was a challenging project 61 <br />overall but he’s proud of the result. Mayor Reinert asked if the amount of the final pay is 62 <br />fair considering the fault of the contractor. Staff explained that this final pay represents 63 <br />additional work that was necessary but wasn’t identified at the onset. The council 64 <br />received confirmation that this will finish the project. 65 <br /> 66 <br />Item 6E – Community Development Director Grochala gave a short overview of the 67 <br />action requesting authorization for an easement over a city trail. 68 <br /> 69 <br />The meeting was adjourned at 6:28 p.m. 70 <br /> 71 <br />These minutes were considered, corrected and approved at the regular Council meeting held on 72 <br />October 10, 2016. 73 <br /> 74 <br /> 75 <br /> 76 <br /> 77 <br />Julianne Bartell, City Clerk Jeff Reinert, Mayor 78 <br /> 79
The URL can be used to link to this page
Your browser does not support the video tag.