My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-10-2016 Council Packet (2)
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
10-10-2016 Council Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:35:19 AM
Creation date
1/6/2017 1:26:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/10/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6D <br /> <br /> <br />STAFF ORIGINATOR: Michael Grochala, Community Development Director <br /> <br />MEETING DATE: October 10, 2016 <br /> <br />TOPIC: Consider Resolution No. 16-80, Approving Municipal Consent, I- <br />35W North Corridor Improvements <br /> <br />VOTE REQUIRED: 3/5 <br /> <br /> <br />INTRODUCTION <br /> <br />Council is to consider approving municipal consent for the Interstate 35W North Corridor <br />improvement project. <br /> <br />BACKGROUND <br /> <br />The Minnesota Department of Transportation (Mn/DOT) is currently completing preliminary <br />design of the 35W North Corridor Project. The proposed project will add a lane in each direction <br />from Highway 36 to Lexington Avenue in Blaine. The lanes will be managed under the MnPass <br />program. Eight (8) additions spot improvements along the corridor are also being recommended <br />as part of the project. Construction is anticipated to start in 2019. <br /> <br />Project Purpose <br /> <br />MnDOT has identified a number of factors justifying the need for the I-35W North Corridor <br />Project. These factors include pavement conditions, mobility, travel time reliability, and transit <br />and carpool advantages. <br /> <br />Improvements Within Lino Lakes <br /> <br />While the added lane only extends to Lexington Avenue the project will involve some <br />resurfacing work past Sunset Avenue and into Lino Lakes. As a result, a noise wall is being <br />proposed for the south side of the interstate within Lino. <br /> <br />Work within Lino Lakes includes repaving approximately 400 feet of the existing northbound <br />and southbound main lines east of Sunset Avenue and construction of approximately 1,600 feet <br />of noise wall on the south side of the interstate. <br /> <br />There are no City costs and no City maintenance responsibilities proposed with the project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.