My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-12-2016 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2016
>
12-12-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2018 9:57:33 AM
Creation date
1/6/2017 1:32:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/12/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017 Road Improvement Project <br />Mill and Overlay - Sealcoat <br />City of Lino Lakes <br />Anoka County <br /> <br /> Engineering Graduate <br />Associate /Project Project Specialist Engineer 2-Person Office Total <br />RLS Manager Engineer V IV Survey Crew Technician Hours Cost <br />Task Description <br />1 <br />A.Topographic Survey (estimate by others)8 8 1,376.00$ <br />Subtotal 8 8 1,376.00$ <br />2 <br />A.Final Plans <br />1.Existing Conditions Plan/Topo Base Map 1 2 16 19 2,099.00$ <br />2.Removals/Demolition Plan 1 4 5 565.00$ <br />3.Traffic Control/Detour Plan 1 2 2 5 601.00$ <br />4.Street Mill/Overlay Plans 1 6 24 31 3,455.00$ <br />5.Storm Sewer Repair 1 2 8 11 1,243.00$ <br />6.Sealcoat Plans 2 1 2 12 2 19 2,145.00$ <br />7.Watershed Permit 2 4 6 702.00$ <br />8.Drainage Review 2 2 2 2 8 962.00$ <br />9.Utility Details Plan (Sanitary/Storm)1 6 7 779.00$ <br />10 Construction Specifications 2 3 4 12 8 29 2,861.00$ <br />11 Misc. Sheets (Title/Details/etc)2 1 6 9 1,065.00$ <br />C.Meetings -$ <br />1.Project Meeting 1 1 1 3 405.00$ <br />2.Design Meeting 1 1 1 3 405.00$ <br />D.Bidding Administration -$ <br />1.Website creation and maitenance 2 3 2 2 9 1,161.00$ <br />2.Advertise bids 1 2 2 2 7 709.00$ <br />3.Create/Distribute Bid Package 2 2 2 6 572.00$ <br />4.Respond to RFIs from prospective bidders 2 2 2 2 8 926.00$ <br />5.Issue addenda, if req'd 1 2 2 5 521.00$ <br />6.Bid Opening/Tabulate results 1 1 2 4 402.00$ <br />7.Letter of Award recommendation to City 2 2 4 384.00$ <br />8 Prepare Notice of Award and Contract 1 2 2 2 7 801.00$ <br />Subtotal 14 26 35 88 22 20 205 22,763.00$ <br />Total Hours 14 26 35 88 22 8 20 213 24,139.00$ <br />Hourly Costs 143.00 137.00 125.00 107.00 94.00 172.00 67.00 <br />Total Direct Labor Costs $2,002.00 $3,562.00 $4,375.00 $9,416.00 $2,068.00 $1,376.00 $1,340.00 <br />TOTAL BASE PROJECT COST 24,139.00$ <br />Budgeted Hours <br />Preliminary Survey <br />Design
The URL can be used to link to this page
Your browser does not support the video tag.