My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05-01-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
05-01-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 10:58:52 AM
Creation date
5/2/2017 10:44:10 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/01/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> engineering planning environmental construction 701 Xenia Avenue South <br /> Suite 300 <br /> Minneapolis, MN 55416 <br /> Tel: 763-541-4800 <br /> Fax: 763-541-1700 <br /> <br />St. Cloud Minneapolis St. Paul <br />Equal Opportunity Employer <br /> wsbeng.com S:\Community Development\Projects\Planning Cases\_CLOSED\Century Farm North\Park Dedication\Staff Reports\A2 wsb memo on trails may 1 work session 2017.doc <br />Memorandum <br /> <br /> <br />To: Rick DeGardner, Public Services Director <br /> <br />From: Ed Youngquist <br /> <br />Date: April 27, 2017 <br /> <br />Re: Century Farm and Lilac Street Trail Extensions <br /> <br /> <br />WSB and Associates was asked to provide a rough cost estimate for bicycle/pedestrian trails. It <br />is recommended that a more detailed cost estimate be prepared as the project moves forward. <br /> <br />Century Farm <br /> <br />The approximate length of the proposed trail extension is 1,830 linear feet. An estimated cost for <br />construction of an 8.5’ wide bituminous trail is $100,000. This assumes that the trail is installed <br />on top of the existing gravel trail. <br /> <br />Lilac Street and Apollo Drive <br /> <br />Lilac Street - The approximate length of the proposed trail extension is 3,130 linear feet. An <br />estimated cost for construction of an 8.5’ wide bituminous trail is $315,000. It is anticipated that <br />easement acquisition would be required to construct this trail, specifically near Molin Concrete. <br /> <br />Apollo Drive - The approximate length of the proposed trail extension is 1420 linear feet. An <br />estimated cost for construction of an 8.5’ wide bituminous trail is $213,000. <br /> <br />Total Cost is $528,000. <br /> <br />Please contact me with any questions Thank you. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.