My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-05-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
06-05-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:00:15 AM
Creation date
6/6/2017 2:19:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/05/2017
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Under State law street reconstruction bonds can be issued without election provided the <br />following requirements are met: <br /> <br />a) The City must prepare a 5 year street reconstruction plan <br />b) The City must hold a public hearing <br />c) The City Council must approve the plan by unanimous vote. <br />d) A 30 day period must elapse during which time a petition may be submitted <br />requesting an election. The petition must be signed by voters equal to 5% of the <br />votes cast in the last municipal general election. <br />e) If no petition is received the city may issue bonds without election. <br /> <br />The draft 2017-2021 Five Year Street Reconstruction Plan has been prepared. The public <br />hearing has been set for the June 12, 2017 City Council meeting. This will allow for the reverse <br />petition process and possible ballot question submittal to Anoka County. If a petition is received <br />a ballot question will be prepared for consideration by the voters in the 2017 municipal election. <br />If no petition is received the council may authorize preparation of plans as specifications for the <br />project. <br /> <br />City Council consideration at the public hearing will be to approve the 5 year Street <br />Reconstruction Plan and authorize the issuance of Street Reconstruction Bonds for the 2018 <br />improvements. Staff would like to emphasis the following points: <br /> <br />• The 2021 project will be subject to future council consideration and action. <br />• Approval of the plan and bond authorization does not obligate the City to construct a <br />project or issue bonds. <br />• The amount of bonds authorized under the plan represents a maximum amount. <br />• The actual amount of bonds issued will be subject to council approval once a final project <br />cost is determined following plan design and bidding process. <br />• The plan allows for the bonding for the West Shadow and LaMotte Improvements to <br />occur anytime during the 2017 – 2021 Five-Year Street Reconstruction Plan. <br /> <br />Requested Council Direction <br /> <br />None required. The public hearing has been scheduled for June 12, 2017. <br /> <br />Attachments <br /> <br />1. Draft 2017-2021 5 year Street Reconstruction Plan
The URL can be used to link to this page
Your browser does not support the video tag.