My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-090 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-090 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 12:04:37 PM
Creation date
6/12/2017 11:12:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
09/12/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. <br />WSB <br />F.0 u:_ -c c 'e a t you:- <br />Memorandum <br />0u <br />Memorandum <br />To: Katie Larsen, City Planner <br />From: Diane Hankee PE, City Engineer <br />Nick Guilliams PE, WSB & Associates <br />Date: August 3, 2016 <br />Re: Chavez Preserve <br />Plan Review <br />WSB Project No. 2988-280 <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the Preliminary Plat documents submitted on July 11, 2016 for Chavez <br />Preserve, Lino Lakes, MN prepared by Westwood. The following are our review comments that <br />should be responded to in writing by the applicant. <br />The plans and specification shall reference the City's 2016 General Specifications and Standard <br />Detail Plates for Street and Utility Construction, the 2013 CEAM, and the 2016 MnDOT <br />Standard Specifications. <br />GRADING, EROSION AND SEDIMENT CONTROL <br />1. Show location for temporary/permanent erosion control measures on the plan sheets as <br />well as estimated quantities. Seven day stabilization requirement (temp/perm). <br />2. Add perimeter control along north side of site where drains away. <br />3. Show location for construction entrance. <br />4. Show location for stockpiles and the appropriate BMP measures for stockpile <br />management. <br />5. Provide SWPPP contact/manager (contractor) as part of a SWPPP amendment. <br />6. Provide appropriate certification requirements for SWPPP developer. <br />7. The Existing Spot Elevation reads "datum???" on the legends of Sheets Cl and C3 — <br />please state the vertical or assumed datum. <br />8. Sheet Cl — all proposed basins require normal water level elevations be shown. <br />Equal Opportunity Employer <br />wsbeng.com <br />K \02988-280tAdm,n\Does\Plan Revw, - Preliminary Plat <br />
The URL can be used to link to this page
Your browser does not support the video tag.