My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-128 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-128 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 12:00:43 PM
Creation date
6/12/2017 1:29:43 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/10/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL <br />AGENDA ITEM 6B <br />STAFF ORIGINATOR: Diane Hankee, City Engineer <br />MEETING DATE: October 10, 2016 <br />TOPIC: Consider Resolution No. 16-128 Order Project, Approving the <br />Plans & Specifications and Authorizing the Ad for Bid, 2016 <br />Surface Water Maintenance Project <br />VOTE REQUIRED: 3/5 Vote Required <br />INTRODUCTION <br />Staff is requesting Council order the project, approve plans and specifications and authorizing <br />advertisement for bids for the 2016 Surface Water Maintenance Project. <br />BACKGROUND <br />In accordance with the City's Surface Water Management Plan, sites have been identified for <br />annual maintenance. Proposed improvements to the storm sewer system include cleaning of storm <br />sewer outfalls, removal of vegetation and sediment deltas in stormwater ponds, minor pond <br />excavation and storm sewer structure repair/replacement. Sites are selected for maintenance based <br />on public input, input from Public Works, and feasibility of locations. <br />The proposed project includes 15 sites throughout the city that have been identified for <br />maintenance of publically owned stormwater infrastructure. Please refer to the attached map for <br />specific site locations. The budget for the project is $100,000. <br />The schedule for this project is as follows: <br />City Council Order Project, Authorizes Plans and Specifications <br />City Council Approves Plans and Specifications <br />City Council Authorizes Ad for Bids <br />City Open Bids <br />City Council Awards Contract <br />Construction Begins <br />Final Completion <br />RECOMMENDATION <br />October 10, 2016 <br />October 10, 2016 <br />October 10, 2016 <br />November 3, 2016 <br />November 14, 2016 <br />November 16, 2016 <br />December 31, 2016 <br />Staff recommends adoption of Resolution No. 16-128 to Order the Project, Approve the Plans & <br />Specifications and Authorizing the Ad for Bid, 2016 Surface Water Maintenance Project. <br />ATTACHMENTS <br />1. Resolution No. 16-128 <br />2. Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.