My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-172 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-172 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 11:57:50 AM
Creation date
6/12/2017 3:03:06 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
12/12/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 23, 2016 <br />City of lino Lakes <br />600 Town Center Pkwy. <br />Lino Lakes, MN 55014 <br />Re: Public Works Space Needs Analysis and Existing Facility Audit <br />On behalf of CNH Architects, our consulting engineers and estimator, thank you for considering our Proposal to provide Facility Space Needs <br />Analysis services for the City of Lino Lakes. <br />The project team presented in this proposal has worked together for many years on City, County, and State projects in the State of Minnesota. <br />Our architectural/engineering team has a common goal to provide quality design services and to be at the forefront of utilizing sustainable building <br />methodologies. We understand the need for an organized process from the first meeting through completion of this study, with clear and detailed <br />documentation along the way. <br />CNH Architects has worked with the City of Lino Lakes as well as numerous municipalities throughout the Twin Cities metropolitan area to provide <br />assessment services, reviewing current conditions of many existing governmental facilities and identifying immediate as well as future growth <br />needs. We communicate closely with our engineers and cost estimator so that our observations are shared and comprehensive, while keeping <br />a holistic approach on the entire project so that the overall building performance and client vision is considered when individual components and <br />systems are under analysis. Details can impact both short and long term effects on cost, maintenance and occupant use, and as a design team we <br />are attentive to these implications at every scale. <br />We look forward to serving the City of Lino Lakes and together evaluate the facility needs of the Public Works Department now and into the future. <br />Respectfully submitted, <br />Quinn S. Huston, AEA, LEED AP <br />Principal <br />CNH Architects, Inc. <br />CNH Architects, Inc. <br />7300 West 147th Street Suite 504 Apple Valley, MN 55124 Phone 952-4314433 www.cnharch.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.