My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-172 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-172 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 11:57:50 AM
Creation date
6/12/2017 3:03:06 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
12/12/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A' <br />i <br />PROJECT APPROACH <br />SUSTAINABILITY <br />The Project Team will provide recommendations for sustainable opportunities in the existing <br />city public works campus as well as any future facilities or sites. CNH has many years of green <br />building experience, with several awarded projects listed in our firm portfolio. We just recently <br />assisted the City of Roseville in utilizing the excess heat generated by the Ice Arena on their city <br />campus to fully heat the new Fire Station we designed for them, providing significant energy cost <br />savings. Creative approaches such as this will be evaluated for Lino Lakes, including initial cost <br />and payback analysis to assist you in making informed choices that best fit the goals and values <br />of the City. <br />OPTION ANALYSIS <br />After gathering all the information on space needs, evaluated the existing public works campus, <br />and developed future needs based on expected growth; CNH will review three approaches for the <br />City of Lino Lakes to meet their Public Works needs. These will include: <br />Option 1— Renovate the existing building and expand to meet future needs. <br />Option 2 — Build an all new facility at the existing west site to provide long-term value. <br />Option 3 — Build an all new facility at the city property at Birch Street and Centerville <br />Road leaving some appropriate elements at the existing west site. <br />The study will review each of the above options, analyzing and listing comparative data on each <br />option in order to provide the City of Lino Lakes with the tools to make an informed decision on <br />the future of the Public Works department facilities. Among others, the review of each option will <br />include the following topics: <br />• Space needs — current and future <br />• Growth potential for each option <br />• Existing facility conditions <br />• Deferred and short-term maintenance <br />• Building code / OSHA compliance <br />• Accessibility compliance <br />• Energy usage and potential for savings <br />• Long-term costs of operation <br />• Capital costs for construction / remodeling proposed <br />• Site location relative to population and infrastructure <br />CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.