My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2016-172 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2016
>
2016-172 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2017 11:57:50 AM
Creation date
6/12/2017 3:03:06 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
12/12/2016
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECTS <br />,>'ni.N0.r31 ED <br />^ed Ain. P011�Emvr Rv®nm . - ♦� <br />XNeendgm.CNRm MSLNIW C,ew ED <br />EAGAN CITY HALL AND POLICE DEPARTMENT ADDITION AND REMODEL <br />EAGAN, MN <br />After over 25 years of use without significant remodeling, the City of Eagan found that the <br />growth of the staff both in administration and the police department was stretching their facility <br />past its ability to meet the current needs. CNN Architects did a comprehensive review of all <br />staffing departments and operations and, along with city staff, developed a space needs <br />analysis identifying both under-utilized space as well as significant shortfalls inoperational space <br />standards. In addition, the building condition was reviewed to determine elements that were <br />either failing or reaching their expected usable life. <br />From this space needs study, CNH developed multiple options for addressing the needs <br />identified in both City Hall and Police Department portions of the building. With staff input, these <br />options were then modified to best meet operational flows, space needs, efficiency, and budget. <br />A detailed construction cost was then determined and the project budget was set. <br />The city is completing the financial planning for this addition and remodeling project which will <br />then move into the construction document and actual construction phases in the near future. <br />Project Architect Quinn Hutson, CNN Architects <br />Reference Dave Osberg, City Administrator, 651-675-5000 <br />POUICESPACE SUMMARY <br />First Floor <br />Addition. <br />Remodel <br />Enclosed Vehicle Garage :.'. <br />45 squad WW1 :.. <br />24,30033' <br />From Lobby/Sally Port- increase Security <br />210 SF <br />Renovate Evidence intake lab and Evidence Storage <br />36050 <br />Renovate Man's and Women's Locker Rooms <br />2,2003F <br />Relocate Tactical Team Room / Renovate Garage g2 <br />3353F <br />Enlarge Computer Forensics OFfue Area <br />BO SF <br />Reduce Number O'Hiddln5 Cells to increase Storage <br />400 SF <br />Sub -Total first Floor <br />::::`i.: 14.3000E <br />3,525 SF <br />Second Floor <br />Addition <br />Remodel <br />Felice Office Expansion <br />3,495 5F <br />Add ;new tiga6om Meeting Room <br />30050 <br />Rer0341, Records Storage Arca <br />37050 <br />Enlarge bilging Conference Room <br />1,00050 <br />Add 2 Administrative Offices at existing Brook Room <br />403 SF <br />Sub -Total Second Floor 3405 SF 10025 <br />Total Proposed Polus Space '17,7g55f{ .5.035 SF <br />vaaeaStPeamecr <br />a+n. an.ira 5rp5d05ora <br />New 11Wilna0iSIOe <br />Garage M10Nn ::.. <br />13 <br />Wane New <br />o <br />Pa,lavl-a <br />5;555.3, <br />E500 CanwutHNm <br />Vsteat aP05xt/RYWx <br />...on 6a.nan 5nada,g <br />SWAM <br />nuttier,' Mkt awatation <br />1310000 <br />Sword new Fine nmox0an <br />1305,00 <br />1 s.iatnx Olrxdlaananden <br />0110000 <br />Pm 0.40 tie bons., <br />4.CM Fumexrt ar wand,. <br />mar an,R00toe Don <br />$045,000 <br />S,,mw roma,, st 1nd f her Poke <br />/0000;5550,60 <br />65000100 Comm aro <br />1ryayme0 <br />1150400 <br />Swam <br />SEbiaRl <br />Taal lMiatNvon ineavdl <br />lot adapimhwnar10050 <br />30.350000 <br />000 <br />CITY OF IJNO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.