Laserfiche WebLink
Extension of Bids <br />STREET AND UTILITY CONSTRUCTION <br />MARSHAN LAKE CONDOMINIUMS <br />CITY OF LINO LAKES, MINNESOTA <br />ANOKA COUNTY, MINNESOTA <br />OSM PROJECT NO. 5521.10 <br />Bid Date: January 18, 1996 <br />10:00 A.M. <br />' Denotes corrected figure. <br />Item Spec No Description Quantity Unh <br />ENGINEERS <br />ESTIMATE <br />TOW BIC $048,997.00 <br />Udt Pala hem Total <br />LOW BIDDER <br />C.W. HOULE, INC. <br />Total Bid: $684,388.40 <br />Unit Price Item Total <br />2ND BIDDER <br />SJ LOUIS CONSTR., INC <br />Toted Bid: $593,277.00 <br />Unit Price Item Total <br />3RD BIDDER <br />KADLEC EXC. OF MORA <br />Total Bid: •$802,957.90 <br />Unh Noe Item Total <br />4TH BIDDER <br />BONINE EXCAVATING, INC. <br />Total Bid: $817,588.30 <br />Unit Price Item Total <br />SCHEDULE At STREETS <br />1 <br />2104.606-00120- <br />REMOVE BITUMINOUS PAVEMENT <br />300 <br />SO YD <br />$3.00 <br />3900.00 <br />93.00 <br />$900.00 <br />$3.00 <br />$900.00 <br />$200 <br />$800.00 <br />52.50 <br />3750.00 <br />2 <br />2104.513-00011- <br />SAWING BR PAVEMENT (FULL DEPTH) <br />670 <br />UN FT <br />$3.00 <br />$2,010.00 <br />$200 <br />$1,340.00 <br />$5.00 <br />33,360.00 <br />$4.00 <br />52.890.00 <br />$260 <br />31.675.00 <br />3 <br />2106.501-00010- <br />COMMON EXCAVATION <br />3900 <br />CU YD <br />$3.00 <br />311.700.00 <br />$135 <br />$5,265.00 <br />$425 <br />$16,575.00 <br />52.00 <br />$7.800.00 <br />$0.01 <br />$39.00 <br />4 <br />2106.62140010- <br />GRANULAR BORROW (LV) <br />3900 <br />CU YD <br />57.00 <br />$27,300.00 <br />$0.01 <br />$39.00_ <br />$5.85 <br />822,815.00 <br />35.25 <br />$20.475.00 <br />30.01 <br />$39.00 <br />5 <br />2112.601-00010- <br />SUBGRADE PREPARATION <br />33 <br />ROAD STA <br />$200.00 <br />36,8000.00 <br />3155.00 <br />$5,115.00 <br />3130.00 <br />$4,290.00 <br />3100.00 <br />33,300.00 <br />3123.00 <br />34,059.00 <br />8 <br />2211.501-00000- <br />AGGREGATE BASE CLASS 6 (RECYCLED) <br />3120 <br />TON <br />37.00 <br />321,840.00 <br />38.80 <br />427,458.00 <br />37.00 <br />$21.840.00 <br />$825 <br />$25.740.00 <br />$6.87 <br />321.434.40 <br />7 <br />2331.614.00030- <br />TYPE 31 BASE COURSE MIXTURE <br />1100 <br />TON <br />$30.00 <br />$33.000.00 <br />$25.40 <br />$27.940.00 <br />$25.00 <br />327,500.00 <br />$24.00 <br />328,400.00 <br />$24.70 <br />$27.170.00 <br />8 <br />2331.608-00040- <br />TYPE 41 WEARING COURSE MIXTURE <br />380 <br />TON <br />$31.00 <br />312,090.00 <br />$33.00 <br />312,870.00 <br />$30.00 <br />$11,700.00 <br />$28.00 <br />310,920.00 <br />$29.16 <br />111,372.40 <br />9 <br />2531.501-04110- <br />CONCRETE CURB & GUTTER DESIGN 0412 <br />6670 <br />UN FT <br />$6.00 <br />$34.020.00 <br />38.00 <br />434.020.00 <br />3826 <br />335,437.50 <br />$6.25 <br />329,767.50 <br />$6.13 <br />334,757.10 <br />10 <br />2367.50240010- <br />BITUMINOUS MATERIAL FOR TACK COAT <br />190 <br />GALLON <br />35.00 <br />3960.00 <br />$1.80 <br />3304.00 <br />$1.99 <br />3313.50 <br />$200 <br />$380.00 <br />31.84 <br />3311.80 <br />11 <br />2573.603-00003- <br />SILT FENCE, PREASSEMBLED <br />2000 <br />UN FT <br />5200 <br />$4,000.00 <br />31.25 <br />$2,600.00 <br />$2.00 <br />34.000.00 <br />31.50 <br />$3,000.00 <br />4242 <br />34,840.00 <br />12 <br />2673.50600030- <br />SODDING TYPE LAWN (INCL 4' TOPSOIL) <br />8900 <br />SO YD <br />32.00 <br />$13,800.00 <br />$1.80 <br />$11,040.00 <br />31.40 <br />$9,880.00 <br />31.96 <br />313,455.00 <br />8221 <br />315,249.00 <br />13 <br />2232.6014)0115- <br />M81 BITUMINOUS SURFACE (1.5') <br />2256 <br />SQ YD <br />$2.00 <br />$4,510.00 <br />30.80 <br />31,804.00 <br />30.52 <br />31,172.80 <br />31.75 <br />33,94825 <br />3051 <br />31.150.05 <br />TOTAL SCHEDULE At STREETS <br />8172,720.00 <br />3130,593.00 <br />3199,563.80 <br />$148,463.75 <br />$122,646.56 <br />SCHEDULE B: STORM SEWER <br />14 <br />2501516-90421. <br />4r RC PIPE APRON W/TRASH GUARD <br />1 <br />EACH <br />$2,600.00 <br />$2,600.00 <br />$1,700.00 <br />$1.700.00 <br />31.600.00 <br />$1.500.00 <br />31,500.00 <br />_ <br />31,500.00 <br />*1,696.00 <br />31,698.00 <br />16 <br />250151540181. <br />18' RC PIPE APRON W/TRASH GUARD <br />4 <br />EACH <br />8700.00 <br />82,800.00 <br />3680.00 <br />$2,720.00 <br />3640.00 <br />*2,560.00 <br />$500.00 <br />42,000.00 <br />3641.00 <br />$2,564.00 <br />16 <br />2503541-00125- <br />12' RC PIPE SEWER DESIGN 3000 CL V <br />140 <br />UN FT <br />$18.00 <br />$2,620.00 <br />318.00 <br />$2,520.00 <br />$26.00 <br />$3,840.00 <br />317.00 <br />$2.380.00 <br />317.30 <br />32,422.00 <br />17 <br />2503.641-00165- <br />16' RC PIPE SEWER DESIGN 3006 CL V <br />638 <br />UN FT <br />819.00 <br />512,12200 <br />$1950 <br />312.441.00 <br />323.00 <br />314,874.00 <br />318.00 <br />$11,484.00 <br />$18.80 <br />$11.994.40 <br />18 <br />2503.64140186- <br />19' RC PIPE SEWER DESIGN 3006 CI. V <br />300 <br />UN FT <br />328.00 <br />$8,400.00 <br />$2125 <br />$6,375.00 <br />$25.00 <br />$7,500.00 <br />$20.00 <br />38,000.00 <br />320.56 <br />36,185.00 <br />19 <br />250354140215- <br />21' RC PIPE SEWER DESIGN 3006 CL V <br />175 <br />LIN FT <br />$30.00 <br />$5,250.00 <br />$25.00 <br />$4,375.00 <br />$32.00 <br />$5,600.00 <br />$30.00 <br />35,250.00 <br />324.85 <br />$4,313.75 <br />20 <br />250354140243 <br />24' RC PIPE SEWER DESIGN 3008 CL 111 <br />174 <br />UN FT <br />$30.00 <br />$5,220.00 <br />426.00 <br />84,624.00 <br />$33.00 <br />$5,742.00 <br />$30.00 <br />$5,220.00 <br />52520 <br />$4,384.80 <br />21 <br />2503.541-90273- <br />27' RC PIPE SEWER DESIGN 3008 CL III <br />29 <br />UN FT <br />$35.00 <br />31,015.00 <br />$33.00 <br />$957.00 <br />$39.00 <br />$1,131.00 <br />$37.00 <br />31,073.00 <br />$32.20 <br />$933.80 <br />22 <br />250354190303- <br />30' RC PIPE SEWER DESIGN 3006 C1.111 <br />283 <br />UN FT <br />245.00 <br />$12,735..00 <br />$37.00 <br />310,471.00 <br />339.00 <br />311,037.00 <br />$40.00 <br />311,320.00 <br />$37.80 <br />310.697.40 <br />23 <br />2503.54140383- <br />38' RC PIPE SEWER DESIGN 3006 C1.111 <br />288 <br />UN FT <br />580.00 <br />515,960.00 <br />$6050 <br />*13.433.00 <br />$52.00 <br />313,832.00 <br />$55..00 <br />314,830.00 <br />351.96 <br />513,818.70 <br />24 <br />2503.54140423- <br />42' RC PIPE SEWER DESIGN 3006 CL III <br />166 <br />UN FT <br />376.00 <br />312,375..00 <br />$71.00 <br />311,715.00 <br />$73.00 <br />$1Z045.00 <br />$80.00 <br />313,200.00 <br />368.70 <br />311,33550 <br />25 <br />260650842420- <br />CONSTRUCT MANI OLE DESIGN 48-4020 <br />10 <br />EACH <br />51.200.00 <br />312,000.00 <br />3925.00 <br />$9,250.00 <br />$1,200.00 <br />312,000.00 <br />31,200.00 <br />*12,000.00 <br />$1,142.00 <br />311,420.00 <br />26 <br />2606.608-03020- <br />CONSTRUCT MANHOLE DESIGN 60-4020 <br />1 <br />EACH <br />$1,600.00 <br />31,5000.00 <br />81,650.00 <br />31,660.00 <br />31,800.00 <br />31,600.00 <br />32,600.00 <br />42,500.00 <br />31,67140 <br />31,571.00 <br />27 <br />2506.508-03620- <br />CONSTRUCT MANHOLE DESIGN 72-4020 <br />2 <br />EACH <br />$2,200.00 <br />$4,400.00 <br />32,800.00 <br />416.800.00 <br />$2,800.00 <br />$5,200.00 <br />*2,750.00 <br />$5,500.00 <br />32,252.00 <br />$4.504.00 <br />28 <br />2506.60644219- <br />CONSTRUCT MANHOLE DESIGN 844019 <br />1 <br />EACH <br />$3,300.00 <br />$3,300.00 <br />$4.060.00 <br />$4,050.00 <br />33,600.00 <br />$3.5000.00 <br />$3.600.00 <br />$3,500.00 <br />33,223.00 <br />33.223.00 <br />29 <br />2509.50242420- <br />CONST DRAINAGE STRUCTURE DES 48-4020 <br />8 <br />EACH <br />$1,200.00 <br />$9,800.00 <br />$875.00 <br />37.000.00 <br />81,100.00 <br />$8,800.00 <br />$1,200.00 <br />39,000.00 <br />31.117.00 <br />$8,836.00 <br />30 <br />2502.541-07040- <br />4' PERF PE PIPE DRAIN <br />400 <br />UN FT <br />315.00 <br />36.000.00 <br />3720 <br />32.880.00 <br />$3.00 <br />31,200.00 <br />$5.75 <br />32.300.00 <br />$3.82 <br />31,528.00 <br />31 <br />2511.501-00013 <br />RANDOM RIPRAP CLASS III WITH TYPE N <br />GEOTEXTILE FABRIC AND GRANULAR BEDDING <br />20 <br />CU YD <br />340.00 <br />$800.00 <br />358.00 <br />$1,180.00 <br />$39.00 <br />3780.00 <br />345.00 <br />$900.00 <br />$40.00 <br />$800.00 <br />32 <br />0461.802-00040- <br />GRANULAR FOUNDATION AND/OR BEDDING <br />670 <br />TON <br />86.00 <br />$3,360.00 <br />30.01 <br />$8.70 <br />$0.01 <br />$6.70 <br />$0.01 <br />36.70 <br />30.01 <br />36.70 <br />IiiCISIL 211oJa.e <br />Page 1 of 9 <br />