Extension of Bids
<br />STREET AND UTIUTY CONSTRUCTION
<br />MARSHAN LAKE CONDOMINIUMS
<br />CITY OF LINO LAKES, MINNESOTA
<br />ANOKA COUNTY, MINNESOTA
<br />OSM PROJECT NO. 5521.10
<br />Bid Date: January 18, 1998
<br />10:00 A.M.
<br />Denotes corrected figure.
<br />Item Spec No MoorlptIon Qusngry Unk
<br />5TH BIDDER
<br />FOREST LAKE CONTR., INC.
<br />Total Bkl: N23,582.30
<br />Unit PAos Item Todd
<br />6TH BIDDER
<br />NORTHDALE CONSTRUCTION
<br />Todd Bid: 1923,758.54
<br />Unit PAW Item Total
<br />7TH BIDDER
<br />REHBEIN EXC., INC.
<br />Total Bid: '3829,014.50
<br />Unit Price Item Total
<br />8TH BIDDER
<br />S.M. HENTGES & SONS, INC.
<br />Total 91d 1948252.00
<br />Unit Price Item Todd
<br />9TH BIDDER
<br />RYAN CONTR., INC
<br />Total Bid: 1854,081.76
<br />UNt Price Item Total
<br />SCHEDULE A: STREETS
<br />1
<br />210450600120-
<br />REMOVE BITUMINOUS P4VEMENT
<br />300
<br />SQ YD
<br />$200
<br />6800.00
<br />$4.00
<br />81,200.00
<br />$1.00
<br />$300.00
<br />3200
<br />6800.00
<br />1200
<br />6000.00
<br />2
<br />2104.613.00011-
<br />SAWING BIT PAVEMENT (FULL DEPTH)
<br />670
<br />UN FT
<br />$225
<br />$1,607.50
<br />$425
<br />12.847.50
<br />$125
<br />$837.50
<br />$2.00
<br />$1,340.00
<br />$250
<br />$1.675.00
<br />3
<br />2106.601-00010
<br />COMMON EXCAVATION
<br />3900
<br />CU YD
<br />1326
<br />612,875.00
<br />$1.26
<br />84,875.00
<br />$0.01
<br />$39.00
<br />$5.00
<br />319,500.00
<br />13.50
<br />113.850.00
<br />4
<br />2106.521-00010
<br />GRANULAR BORROW (LV)
<br />3900
<br />CU YD
<br />34.00
<br />815,000.00
<br />31.25
<br />14,875.00
<br />10.01
<br />339.00
<br />$5.00
<br />$19,500.00
<br />$8.50
<br />125,360.00
<br />6
<br />2112.501430010
<br />SUBGRADE PREPARATION
<br />33
<br />ROAD STA
<br />$150.00
<br />$4,950.00
<br />$125.00
<br />$4,125.00
<br />$130.00
<br />$4290.00
<br />1100.00
<br />$3.300.00
<br />3125.00
<br />$4.125.00
<br />6
<br />221150100000
<br />AGGREGATE BASE CLASS 6 (RECYCLED)
<br />3120
<br />TON
<br />38.00
<br />$18,720.00
<br />18.06
<br />$26.115..00
<br />17.10
<br />$22,152.00
<br />17.00
<br />$21.840.00
<br />$8.00
<br />124,950.00
<br />7
<br />2331.514-00030
<br />TYPE 31 BABE COURSE MIXTURE
<br />1100
<br />TON
<br />$24.00
<br />$26,400.00
<br />124.60
<br />326,960.00
<br />325.66
<br />,
<br />828,106.00
<br />124.50
<br />328,960.00
<br />$23.00
<br />$25,300.00
<br />8
<br />2331.60600040-
<br />TYPE 41 WEARING COURSE MIXTURE
<br />390
<br />TON
<br />128.00
<br />310,920.00
<br />$27.50
<br />110,725.00
<br />$3020
<br />*11,778.00
<br />$28.50
<br />$11,115.00
<br />125.00
<br />110,140.00
<br />9
<br />2531.601-04110
<br />CONCRETE CURB & GUTTER DESIGN 0412
<br />5870
<br />LIN FT
<br />15.50
<br />$31,185.00
<br />38.46
<br />138,82820
<br />$6.00
<br />$34,020.00
<br />15.60
<br />$31,752.00
<br />15.00
<br />$28,350.00
<br />10
<br />7367.60240010
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />190
<br />GALLON
<br />11.60
<br />$285.00
<br />11.85
<br />$313.50
<br />$1.70
<br />1323.00
<br />31.00
<br />$304.00
<br />$1.50
<br />1285.00
<br />11
<br />2573.6060000.$
<br />SILT FENCE, PREASSEMBLED
<br />2000
<br />LIN FT
<br />$2.00
<br />$4,000.00
<br />$2.25
<br />$4,500.00
<br />31.50
<br />$3.000.00
<br />$2.00
<br />$4.000.00
<br />$125
<br />12.500.00
<br />12
<br />2573.50600030
<br />8000210 TYPE LAWN (INCL 4• TOPSOIL)
<br />6900
<br />80 YD
<br />$1.75
<br />$12,076.00
<br />$1.84
<br />312,896.00
<br />$1.75
<br />$12,075.00
<br />11.580
<br />010,350.00
<br />11.90
<br />813,110.00
<br />13
<br />2232.501-00115
<br />MILL BITUMINOUS SURFACE (1.6')
<br />2266
<br />so YD
<br />31.20
<br />82,705.00
<br />$1.80
<br />$4,069.00
<br />30.55
<br />91,24026
<br />10.50
<br />31,127.50
<br />31.05
<br />33,720.75
<br />TOTAL SCHEDULE A: STREETS
<br />3141,823.60
<br />3133,910.20
<br />:116,199.76
<br />6151,678.50
<br />8153,796.76
<br />SCHEDULE S: STORM SEWER
<br />.14
<br />260151640421.
<br />42' RC PIPE APRON W/TRASH GUARD
<br />1
<br />EACH
<br />$1,700.00
<br />11,700.00
<br />11,85724
<br />11,85724
<br />81,670.00
<br />31,670.00
<br />31,600.00
<br />81,500.00
<br />31,350.00
<br />31,350.00
<br />16
<br />250151540181.
<br />ir RC PIPE APRON W/TRASH GUARD
<br />4
<br />EACH
<br />1700.00
<br />$2,800.00
<br />159252
<br />12,370.08
<br />1645.00
<br />82,580.00
<br />1750.00
<br />$3,000.00
<br />1726.00
<br />12,900.00
<br />18
<br />2503.54140125-
<br />12' RC PIPE SEWER DESIGN 3008 CL V
<br />140
<br />LIN FT
<br />321.00
<br />12.940.00
<br />122.37
<br />$3,131.80
<br />$20.50
<br />$2,884.00
<br />$17.00
<br />32,380.00
<br />$25.00
<br />$3,500.00
<br />17
<br />2503.54140166
<br />16' RC PIPE SEWER DESIGN 3006 CL V
<br />838
<br />LN FT
<br />322.00
<br />314,035.00
<br />$23.84
<br />315,082.32
<br />$20.90
<br />313,33420
<br />119.00
<br />112,122.00
<br />326.00
<br />118,688.00
<br />18
<br />2503541401
<br />16' RC PIPE SEWER DESIGN 3006 CL V
<br />300
<br />UN FT
<br />$23.00
<br />38,900.00
<br />82553
<br />17,869.00
<br />$2335
<br />17,006.00
<br />121.00
<br />68,300.00
<br />$29.00
<br />$8,700.00
<br />19
<br />250354140216
<br />21' RC PIPE SEWER DESIGN 3008 CL V
<br />175
<br />LIN FT
<br />$28.00
<br />$4,560.00
<br />$2920
<br />35,110.00
<br />$27.70
<br />34,84750
<br />$25.00
<br />$4.375.00
<br />$36.00
<br />$8,125.00
<br />20
<br />260354140243.
<br />24' RC PIPE SEWER DESIGN 3008 CL 111
<br />174
<br />UN FT
<br />$27.00
<br />14,898.00
<br />129.62
<br />$5,153.88
<br />8288.30
<br />$4,92420
<br />$26.00
<br />• $4.624.00
<br />$35.00
<br />$8,090.00
<br />21
<br />2503.54140273.
<br />27' RC PIPE SEWER DESIGN 3006 CL II
<br />29
<br />UN FT
<br />$35.00
<br />31,016.00
<br />136.01
<br />$1,04429
<br />537.70
<br />31,093.30
<br />$33.00
<br />1957.00
<br />341.00
<br />11,305.00
<br />22
<br />2603.54140303-
<br />30' RC PIPE SEWER DESIGN 3006 CLAN
<br />283
<br />LIN FT
<br />$30.00
<br />311,037.00
<br />$39.84
<br />311,218.12
<br />341.00
<br />1$11,77280
<br />$37.00
<br />110,471.00
<br />$48.00
<br />313,018.00
<br />23
<br />2503.54140383.
<br />36' RC PPE SEWER DESIGN 3005 CL III
<br />208
<br />LIN FT
<br />353.00
<br />$14,088.00
<br />$5290
<br />*14,071.40
<br />355.10
<br />314.858.00
<br />85200
<br />313,832.00
<br />$82.00
<br />116,49200
<br />24
<br />250854140423
<br />42' RC PIPE SEWER DESIGN 3008 CUM
<br />186
<br />LIN FT
<br />$73.00
<br />312,046.00
<br />$7022
<br />311.58620
<br />$72.90
<br />312,02850
<br />$70.00
<br />111,550.00
<br />$84.00
<br />113,950.00
<br />25
<br />2506.50842420
<br />CONSTRUCT MANHOLE DESIGN 484020
<br />10
<br />EACH
<br />31,200.00
<br />312,000.00
<br />31,08027
<br />110,802.70
<br />*1,185.00
<br />$11,850.00
<br />$1,250.00
<br />112,500.00
<br />31,080.00'
<br />810,800.00
<br />28
<br />2606.50803020
<br />CONSTRUCT MANHOLE 0E81011 00.4020
<br />1
<br />EACH
<br />$1,800.00
<br />$1,800.00
<br />11,881.84
<br />11,881.84
<br />12,0000.00
<br />12,0000.00
<br />$2,0800.00
<br />$2,000.00
<br />$1,680.00
<br />$1,880.00
<br />27
<br />2608.60603820
<br />CONSTRUCT MANHOLE DESIGN 72-4020
<br />2
<br />EACH
<br />$2,700.00
<br />$5,400.00
<br />32,50329
<br />$5,008.58
<br />$2,960.00
<br />$5.900.00
<br />13,500.00
<br />17,000.00
<br />12,200.00
<br />84,400.00
<br />28
<br />250650604216
<br />CONSTRUCT MANHOLE DESIGN 84-4019
<br />1
<br />EACH
<br />$4.000.00
<br />$4,000.00
<br />$3,793.92
<br />$3,790.92
<br />$4,185.00
<br />$4,166.00
<br />$5,000.00
<br />35,000.00
<br />$3,070.00
<br />$3,070.00
<br />29
<br />250160602420-
<br />CONST DRAINAGE STRUCTURE DES 48-4020
<br />8
<br />EACH
<br />$1,200.00
<br />39,800.00
<br />$1,080.49
<br />38.643.92
<br />31,145.00
<br />19,100.00
<br />$1,250.00
<br />$10,000.00
<br />$796.00
<br />16,360.00
<br />30
<br />2502.54107040
<br />4' PERF PE PIPE DRAIN
<br />400
<br />LIN FT
<br />$4.76
<br />81,000.00
<br />6650
<br />32,600.00
<br />37.00
<br />81,800.00
<br />21200
<br />$4,800.00
<br />310.00
<br />$4.000.00
<br />31
<br />2611.601-00016
<br />RANDOM RIPRAP CLASS m WITH TYPE IV
<br />GEOTEXRE FABRIC AND GRANULAR BEDDING
<br />20
<br />CU YD
<br />866.00
<br />31,100.00
<br />$87.93
<br />31,358.80
<br />655.00
<br />31,100.00
<br />650.00
<br />$1,000.00
<br />340.00
<br />$800.00
<br />32
<br />0451.80640040
<br />GRANULAR FOUNDATION AND/OR BEDDING
<br />870
<br />TON
<br />66.00
<br />$4,020.00
<br />$0.01
<br />$8.70
<br />$0.01
<br />15.70
<br />310.00
<br />66.700.00
<br />$10.00
<br />16.700.00
<br />►NCIVLLNEND81032110.XL9
<br />Page 4 of 9
<br />
|