Extension of Bids
<br />STREET AND UTIUTY CONSTRUCTION
<br />MARSHAN LAKE CONDOMINIUMS
<br />CITY OF LINO LAKES, MINNESOTA
<br />ANOKA COUNTY, MINNESOTA
<br />OSM PROJECT NO. 5521.10
<br />Bid Date: January 18, 1996
<br />10:00 A.M.
<br />Denotes corrected figure.
<br />Item Spec No Description Quantity Unit
<br />10Th BIDDER
<br />ARGON CONSTRUCTION CO.,IN
<br />Total Bid: 1686,004.84
<br />Unit Price Item Total
<br />11TH BIDDER
<br />RICHARD KNUTSON INC.
<br />Total BW: 14172,016.38
<br />Unit Pilo. Item Total
<br />12TH BIDDER
<br />BROWN & CRIS, INC.
<br />Total Bid: $682,837.10
<br />Unit Price Item Total
<br />13Th BIDDER
<br />KOBER EXCAVATING, INC.
<br />Total Bid: $707,345.81
<br />Unit Price item Total
<br />SCHEDULE As STREETS
<br />1
<br />2104.506-00120-
<br />REMOVE BITUMINOUS PAVEMENT
<br />300
<br />SO YD
<br />$200
<br />3800.00
<br />$2.50
<br />$750.00
<br />31.55
<br />$468.00
<br />37.05
<br />$2,115.00
<br />2
<br />2104.61340011•
<br />SAWING BIT PAVEMENT (BULL DEPTH)
<br />870
<br />LIN FT
<br />$5.00
<br />$3,350.00
<br />' $3.00
<br />$2,010.00
<br />$3.06
<br />$2043.50
<br />3297
<br />81.969.90
<br />3
<br />2105.601-00010
<br />COMMON EXCAVATION
<br />3000
<br />CU YD
<br />$0.00
<br />$23,400.00
<br />33.90
<br />815,210.00
<br />32.50
<br />39.750.00
<br />31.53
<br />$5,967.00
<br />4
<br />2106.521-00010
<br />GRANULAR BORROW (LV)
<br />3000
<br />CU YD
<br />3820
<br />$31,980.00
<br />$7.10
<br />$27,690.00
<br />313.95
<br />354,406.00
<br />37.50
<br />329,250.00
<br />5
<br />2112.501-00010
<br />SUBGRADE PREPARATION
<br />33
<br />ROAD STA
<br />3176.00
<br />35775.00
<br />$123.00
<br />$4,078.80
<br />312240
<br />$4,03920
<br />$12320
<br />34,006.80
<br />0
<br />2211.501-00000.
<br />AGGREGATE BASE CLASS 5 (RECYCLED)
<br />3120
<br />TON
<br />$7.67
<br />$23,930.40
<br />88.90
<br />321,528.00
<br />37.85
<br />324,492.00
<br />310.12
<br />$31,574.40
<br />7
<br />2331.61440030
<br />TYPE 31 BASE COURSE MIXTURE
<br />1100
<br />TCN
<br />$23.00
<br />$25,300.00
<br />$24.82
<br />$27,302.00
<br />$24.68
<br />$27,038.00
<br />$3124
<br />$34.364.00
<br />8
<br />2331.60840040
<br />TYPE 41 WEARING COURSE MIXTURE
<br />390
<br />TON
<br />$26.00
<br />310,140.00
<br />$29.30
<br />311,427.00
<br />$29.02
<br />311,317.80
<br />$38.74
<br />$14,328.00
<br />0
<br />2531.601-04110
<br />CONCRETE CURB & GUTTER DESIGN D412
<br />5870
<br />UN FT
<br />$5.88
<br />$33,22820
<br />36.63
<br />$31,355.10
<br />$6.51
<br />$31,241.70
<br />$6.81
<br />832,04270
<br />10
<br />2357.50200010
<br />BITUMINOUS MATERIAL FOR TACK COAT
<br />190
<br />GALLON
<br />31.50
<br />3285.00
<br />$1.85
<br />$313.50
<br />$1.83
<br />3309.70
<br />31.32
<br />$250.80
<br />11
<br />2573.003-00003-
<br />8117 FENCE. PREASSEMBLED
<br />2000
<br />UN FT
<br />8125
<br />$2.500.00
<br />31.38
<br />$2,700.00
<br />31.90
<br />$3,800.00
<br />$127
<br />$2,540.00
<br />12
<br />2673.506-00030
<br />SODDING TYPE LAWN (INCL 4' TOPSOIL)
<br />8900
<br />SO YD
<br />8225
<br />$15,625.00
<br />$1.48
<br />810,212.00
<br />31.90
<br />$13,110.00
<br />$237
<br />318,353.00
<br />13
<br />2232501-00116
<br />MEL BITUMINOUS SURFACE (1.5')
<br />2255
<br />SO YD
<br />81.65
<br />33,720.75
<br />80.52
<br />81,172.00
<br />$1.05
<br />$2.387.75
<br />31.43
<br />33,224.65
<br />TOTAL SCHEDULE A: STREETS
<br />3179,732.33
<br />8155,009.00
<br />8184,379.85
<br />3175,965.85
<br />SCHEDULE Bs STORM SEINER
<br />14
<br />2601.615-90421.
<br />42' RC PIPE APRON W/TRASH GUARD
<br />1
<br />EACH
<br />82.000.00
<br />$2,000.00
<br />81,918.51
<br />81,916.61
<br />81,323.00
<br />81,323.00
<br />31,543.92
<br />31,543.92
<br />15
<br />2501.61540181•
<br />18' RC PIPE APRON WRRASH GUARD
<br />4
<br />EACH
<br />3886.00
<br />$2,800.00
<br />8887.00
<br />$2,748.00
<br />5503.00
<br />$2,012.00
<br />$638.45
<br />32,663.80
<br />18
<br />250354140126
<br />12' RC PIPE SEWER DESIGN 3008 CL V
<br />140
<br />LIN FT
<br />$20.62
<br />$2,87280
<br />821.89
<br />33,064.00
<br />321.90
<br />$3,088.00
<br />321.15
<br />$2,961.00
<br />17
<br />2503.64140165
<br />15' RC PIPE SEWER DESIGN 3008 CL V
<br />638
<br />UN FT
<br />$20.48
<br />813,08624
<br />822.28
<br />314,814.04
<br />$22.75
<br />814,514.50
<br />$1959
<br />812,498.42
<br />18
<br />250354140186
<br />18' RC PIPE SEWER DESIGN 3008 CL V
<br />300
<br />UN FT
<br />_ 323.72
<br />37,118.00
<br />$25.12
<br />$7,530.00
<br />$2450
<br />$7,350.00
<br />325.40
<br />37,020.00
<br />19
<br />250354140216
<br />21' RC PIPE SEWER DESIGN 3008 CL V
<br />175
<br />UN FT
<br />$25.83
<br />84,62025
<br />327.46
<br />$4,80650
<br />$27.85
<br />84,873.75
<br />$35.51
<br />$6,21425
<br />20
<br />25800.64140243.
<br />24' RC PIPE SEWER DESIGN 3008 CL III
<br />174
<br />LN FT
<br />52028
<br />54,572.72
<br />$27.92
<br />34,858.08
<br />528.70
<br />$4,903.80
<br />83624
<br />$8,306.78
<br />21
<br />2603.54140273-
<br />27' RC PIPE SEWER DESIGN 3008 CL III
<br />29
<br />LIN FT
<br />$38.83
<br />31,12027
<br />815.39
<br />31,026.31
<br />834.80
<br />$1,00920
<br />341.23
<br />31,196.87
<br />22
<br />250354140300
<br />30' RC P1PE SEWER DESIGN 3006 CL III
<br />283
<br />UN FT
<br />338.18
<br />$10,238.04
<br />$37.48
<br />$10,601.18
<br />$39.00
<br />311.037.00
<br />$49.17
<br />$13,915.11
<br />23
<br />250354140303.
<br />38' RC PIPE SEWER DESIGN 3008 C1.111
<br />208
<br />LN FT
<br />$50.52
<br />$13.438.32
<br />$50.88
<br />313,634.08
<br />$5150
<br />813,899.00
<br />$8524
<br />517,363.84
<br />24
<br />2503.54140423-
<br />42' RC PIPE SEWER DESIGN 3006 C1.111
<br />106
<br />LIN FT
<br />887.72
<br />311,173.80
<br />$07.87
<br />311,19855
<br />38850
<br />811,302.50
<br />375.33
<br />$12429.45
<br />25
<br />2500.608-02420
<br />CONSTRUCT MANHOLE DESIGN 48-4020
<br />10
<br />EACH
<br />31,240.00
<br />812400.00
<br />81,385.55
<br />$13,855.50
<br />51,043.00
<br />310,430.00
<br />31,398.93
<br />813,989.30
<br />28
<br />2608.60840020.
<br />CONSTRUCT MANHOLE DESIGN 00.4020
<br />1
<br />EACH
<br />81,900.00
<br />81,900.00
<br />$2107.60
<br />82,107.60
<br />51,080.00
<br />31,680.00
<br />$1,882.01
<br />$1.882.01
<br />27
<br />2506.608-03020
<br />CONSTRUCT MANHOLE DESIGN 72-4020
<br />2
<br />EACH
<br />$3,096.00
<br />86,190.00
<br />83,465.03
<br />86.910.06
<br />53.066.00
<br />30.132.00
<br />83.136.88
<br />56,73.78
<br />26
<br />2506.50604213.
<br />CONSTRUCT MANHOLE DESIGN 84-4019
<br />1
<br />EACH
<br />84,320.00
<br />$4,320.00
<br />$4,83950
<br />$4,83950
<br />33.709.00
<br />$3.796.00
<br />84,306.11
<br />$4,306.11
<br />29
<br />2508.50242420
<br />CONST DRAINAGE STRUCTURE DES 48-4020
<br />8
<br />EACH
<br />31,206.00
<br />39,610.00
<br />31,185.01
<br />59.480.08
<br />31,020.00
<br />38,100.00
<br />81,398.93
<br />311,191.41
<br />30
<br />2502.641-07040.
<br />4' PERF PE PIPE DRAIN
<br />400
<br />UN FT
<br />313.00
<br />$5,200.00
<br />810.00
<br />$4,000.00
<br />$9.30
<br />33,720.00
<br />88.34
<br />83,336.00
<br />31
<br />2511.50140013-
<br />RANDOM R1PRAP CLASS III WITH TYPE N
<br />GEOTEXTILE FABRIC AND GRANULAR BEDDING
<br />20
<br />CU YD
<br />849.00
<br />$980.00
<br />340.00
<br />$800.00
<br />343.80
<br />887200
<br />$40.42
<br />$606.40
<br />32
<br />0451.60240040
<br />GRANULAR FOUNDATION AND/OR BEDDING
<br />870
<br />TON
<br />$0.01
<br />$6.70
<br />31250
<br />$8,375.00
<br />$0.10
<br />$07.00
<br />$7.40
<br />$4,99820
<br />FecmLsos6ti2t1oxL8
<br />Page 7 of 9