Laserfiche WebLink
AG E.1 3A ITEM 7C <br />STAFF ORIGINATOR Powell TKDA <br />DATE May 10. 19 <br />TOPIC <br />Consideration of R olution No. <br />(73rder Preparation of Feasibility f <br />Cedar tree t Station <br />Lino Lakes Sewer District No. 3 is generally located around the I--5Ein tet <br />interchange. The Clearwater Creek Development Center as well Ps tib new Clearwater <br />Creek subdivision are contained within District No. 3. The sewer o nnect n to <br />the Metropolitan system in this area will bye via a City lift station whiff is connected " <br />directly to MVVCC 76-51, a Metropolitan Co 'I forcemain'interceptor. This City lift <br />station is to be constructed on corner of Cedar Street and Otter Lake <br />Road and is referred to as the Cedar Street Lift Station. <br />When this project was initiated the funding fru the liftstationwas to come directly from <br />the City's Area/Unit (Enterprise) Fund with no looming involved It was decided at a <br />recent meeting with City staff and the City's bonding consultant, Springsteadi Inc. that <br />the project would be included in a fine Gity bond issue. This would reduce the <br />project impact on the City's Area/Unit Fuad. In order to qualify as a bondable p <br />• <br />In accordan with Ml <br />res that a Fe <br />nprovernent. <br />be prepared and a public' <br />Approve Resolution No. 96-50 Bering Prepara on of a R <br />Cedar Street Lift Station. <br />Return the matter to staff for further review. <br />RECO AE lAT ?N. <br />OP <br />P <br />► Resolution No. <br />itreet Lift Station <br />Bering Preparation of a Report for <br />