Laserfiche WebLink
WHEREAS, it is considered in the public's best interest <br />for the State to provide a new cabinet and controller for said <br />new traffic control signal. Such materials as described <br />immediately above shall hereinafter be referred to as "State <br />furnished materials"; and <br />WHEREAS, the County, City and State will participate in <br />the cost, maintenance and operation of the traffic control signal <br />with street lights, EVP System and signing as hereinafter set <br />forth; <br />NOW, THEREFORE, IT IS AGREED AS FOLLOWS: <br />1. The City shall prepare the necessary plan, <br />specifications and proposal which shall constitute "Preliminary <br />Engineering" The City- shalll also perform construction <br />inspection reauired to complete the items of work hereinafter set <br />fort~, which shall constitute "Engineering a:c-nsrection" and <br />shall be so referred to hereinafter_ <br />2. The contract cost of the work or, if the work is <br />not contracted, the cost of all labor, materials, and equipment <br />rental required to complete the work, except the cost of <br />providing the power supply to the service pole or pad, shall <br />constitute the actual "Construction Cost" and shall be so <br />referred to hereinafter. <br />3. The City with its own forces and equipment or by <br />contract shall install a new traffic control signal with street <br />lights, EVP System and signing on Trunk Highway No. 49 (Hodgson <br />73845 <br />-2- <br />