My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/09/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
10/09/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2017 3:16:40 PM
Creation date
6/30/2017 1:36:43 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/09/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F Provide forms and documents needed for normal office use <br />for 1% of the inspection fees invoiced up to a maximum of <br />$200.00 per year. <br />3. CITY'S OBLIGATIONS <br />3.1 General Description. The City shall: <br />A. Receive and process electrical permits and fees in <br />accordance with a fee schedule. <br />B. Forward the white copy of the permits to Contractor, retain <br />the pink copy of the permit, and file same in <br />alpha/numerical order by address until the completed white <br />copy is returned with the report of the completed <br />inspections and permits. <br />C. Receive and process orders for payment and fees collected <br />for fee shortages and extra or special inspections. <br />D Adopt an ordinance to provide for an electrical inspection of <br />all installations requiring inspection within the City. <br />Keep on file with the State Board of Electricity copies of the <br />current inspection ordinance. <br />Adopt the most recent revision of the Minnesota Electrical <br />Act including M.S. 326.01. <br />Adopt the Minnesota Rules Chapter 3800. <br />Notify electrical utilities servicing the City that all services <br />installed, replaced or repaired for which an electrical permit <br />is required must be approved by the Contractor. <br />4. PAYMENT <br />4.1 Compensation. The City shall pay to Contractor for the purchased <br />services 80% of the permit fees collected for permits on the report <br />for completed inspections. <br />4.2 Invoices. Contractor shall, within fifteen (15) working days <br />following the last day of each calendar month in which the <br />services were provided, submit an invoice and request for <br />payment on an invoice form acceptable to the City. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.