Laserfiche WebLink
r• lest tA;n s2WM EVERT. THEY MUST BE <br />RENTED R11FJ1 T Of THE REACH APPROKMATAT ONE- <br />NAATIE 1IEIOIT a 11€I64 646. <br />ANY SEDIMENT REMM6NQ M PACE AFTER TIE ALT <br />FENCE CR FILTER FABRIC R NO LONGER REWIRED <br />ANLL BE DRESSED TO CONFORM YRTN THE EXISTING <br />GRADE. PREPARED, AND SEEDED W1T1 THE <br />APPROPRIATE SEED MIK, AS DIRECTED IN THE <br />ENONEER. <br />1.3.4 REMOVAL Of SILT FENCE - SILT FENCES SHALL BE <br />REMOVED WNFN THEY HAVE SERA", THEIR USEFUL <br />PURPOSE, BUT NOT BEFORE THE UPWARD SL0PN0 AREA HAS <br />BEEN PERMANENTLY STADIUM. IF THE UPWARD SLOPING AREA HAS <br />AREA IS TO BE EXPOSED LONGER 11441 SO (6) <br />MOTORS, THAT AREA AUAll BE COVERED WITH TEMPORARY <br />VEGETATION WHEN FIRST EXPOSED. <br />-- CARL - -------- <br />- <br />--- -- <br />ROA D.. <br />AROADWAY WHILE OPCENf MEAS. IRNIO ADEQUATE i110511011 CON7ROl N <br />3. SUFFICIENT TOPSOIL ANLL BE STOCKPILED TO ALO, FOR THE <br />REPIICEMENT OF 4. OF TOPSOIL FOR DISTURBED MEAS TO BE <br />REVEOETATED. <br />4. TIE CONTRACTOR SHILL SCHEDULE 9TE MOM, UMY <br />N5TAUATION AND ROADWAY CONSTRUCTION SO THAT TIE DENERA. <br />UTE CM BE MULCHED AND RE -SEEDED SOON AFTER DISTURBANCE. <br />AREAS THAT ,ILL NOT BE SUBJECT TO CONSTRUCTOR TRAFFIC <br />SNAIL BE SEEDED AND MULCHED OR SODDED WITHIN TWO (2) <br />WEEKS OF BONG DISTURBED. <br />5. THE GRASSES UTILIZED N THE SEED AND S00 AREAS SHALL BE. <br />OF THE SHADE 10LERA T TYPE <br />B. FOLLOWING CONSTRUCTION OF CATCH BASNS, HAY BALES AND <br />SILT FENCE STALL BEPLACED AS SHOWN TO LIMIT SILTATION <br />LEADING TO THE SEDIMENT <br />PONDS. TESE MEASURES SHP4i <br />REMAN N PUCE UNTIL PLACEMENT Of BITUMINOUS COURSE. <br />COUNTY DITCH NO. 22 <br />ST(EE1` <br />• <br />u uuLnLUUVL•UUUL^cUL. <br />FOR APPROVAL ONLY <br />- TOP BREAK OF DITCH <br />18: <br />901.0 <br />901.0 <br />-l- <br />r <br />T <br />Li <br />1 <br />TAXIWAY <br />EASEMENT <br />12 <br />0 <br />�\3 <br />