My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/23/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
01/23/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2017 2:47:37 PM
Creation date
7/3/2017 1:18:24 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/23/1995
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 10-C <br />STAFF ORIGINATOR John Powell. Acting City Engineer <br />DATE January 20. 1995 <br />TOPIC Consideration of Bid <br />Lakeview Piace/LaMotte Drive Ditch Cleaning <br />BACKGROUND: <br />The plans and specifications for this ditch cleaning project were ordered in October, <br />1994 and as its estimated cost was less than $25,000 bids were solicited and <br />advertising was not required. Only one bid was actually submitted by a contractor and <br />that bid was for $29,122.10 compared to an engineer's estimated cost of $14,604.00. <br />The bid was rejected. At the City Council meeting on October 24, 1994 the Council <br />authorized Rocky Keehn of SEH to wait a short time and again solicit quotes for the <br />project. On January 9, 1995 the quotations for the second round of bidding were <br />opened and again only one quote was received. The sole quote was received from Ro- <br />So Contracting for $30,039.35, almost twice the revised engineer's estimate of <br />$16,864.00. It is recommended that this bid also be rejected. We recommend this <br />project be incorporated into one of the larger improvement projects to be bid in 1995. <br />This would lead to lower, more competitive unit prices. Some cleaning of the east -west <br />ditch has been done, this should allow the proposed project to be delayed until Spring <br />of 1995. <br />OPTIONS: <br />1. Reject the bid and complete the work as part of a larger project in 1995. <br />2. Return the matter to staff for further review. <br />RECOMMENDATION: <br />Option No. 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.