Laserfiche WebLink
AGENDA ITEM V C <br />STAFF ORIGINATOR: Mary Kay Wyland <br />DATE: 6/7/96 <br />TOPIC: EAM, 4th Avenue, Site Plan Review <br />BACKGROUND: <br />CNH Architects has submitted a site plan review package for Emergency <br />Maintenance Apparatus (EAM). MIwouldlike to construct a 5,250 -square foot <br />building with 5,600 square feet of future expansion area on 4th Avenue next to <br />the Klosner-Goertz building in the Apollo Business Park. The building will <br />consist of office, warehousing area, and repair bays. The proposed site is <br />approximately one acre in size, is zoned General Industrial, and is shown as <br />industrial on the city's Land Use Plan. <br />EAM repairs, customizes and upgrades emergency apparatus for fire <br />departments, including the Centennial Fire District, and is a distributor for <br />pumps, lighting, foam systems and valves. They have been leasing space in <br />Blaine since 1987 and currently employ six people. They anticipa <br />employee every 18 months. EDAAB has recommended awf <br />and will be providing TIF to cover the cut of a portion of the s• <br />SITE PLAN REVIEW: <br />SETBACKS: The building is proposed to be constructed 60 feet back from 4th <br />Avenue. The required setback from a collector or arterial street is 50 feet. <br />BUILDING EXTERIOR: The proposed construction is rock face concrete block, <br />with accent colored block striping. It will be compatible with other buildings in the <br />business park. <br />BUILDING HEIGHT: The building will be 18 feet dear in height. <br />GREEN AREA: A minimum green area of 10% is required by the Zoning <br />Ordinance. This will be met with the proposed site plan and future expansion <br />area. <br />OFF-STREET PARKING: Eight parking stalls will be provided and include one <br />handicapped van space. The proposed construction based on the number of <br />employees actually requires six. <br />