My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/11/1995 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
1995
>
01/11/1995 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 12:29:50 PM
Creation date
7/7/2017 9:03:32 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/11/1995
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'pit <br />The property owner pursuing the proposed development must <br />demonstrate compliance with the aforementioned guidelines to secure <br />MUSA allocation. The assignment of MUSA would occur with the <br />approval of the final plat and would represent the net buildable <br />area of the plat. <br />The benefits of the urban expansion area and MUSA land bank system <br />include: <br />1. The MUSA from the land reserve would be assigned on the net <br />buildable acres of the subdivision or development. This would <br />be quantified by the City during the review process. This <br />will provide an accurate accounting of consumed MUSA and <br />utility capacity. <br />2. The assignment of MUSA with the final plat assures timely use <br />of the MUSA designation. Final plat approval requires <br />financial guarantees and a development agreement to insure <br />development performance. <br />3. The land bank system provides a degree of flexibility with <br />regard to community planning. Without the geographic <br />designating of the MUSA, the City avoids creating a vested <br />property right via Anoka County tax assessment policy. This <br />allows the City to address areas experiencing development <br />pressures. <br />4. The land bank system will allow for the logical expansion of <br />urban growth that will bring urban utilities in closer <br />proximity to unsewered subdivisions. This sewer availability <br />is necessary to allow the City to respond in the event of <br />septic system failure. <br />5. Due to the Charter limitation, public utility extension will <br />be development driven and financed in the future. The land <br />bank system allows the City some flexibility to accommodate <br />development that helps facilitate the City's long range <br />utility infrastructure planning. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.