My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/08/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
11/08/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 10:35:51 AM
Creation date
7/7/2017 10:08:30 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/08/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOU-03- 1995 09:21 NAC 512 595 9837 P.05 <br />Utilities. As part of the proposed church expansion, a hook up to City sewer and water <br />service is intended. This issue and details related to septic system removal and well <br />capping should be subject to comment/recommendation of the City Engineer. <br />Wetlands_ As a condition of CUP approval, the applicants will be required to demonstrate <br />no wetland impact. This issue should be subject to further comment by the City Engineer. <br />Elm Street Elm street which abuts the subject property on the south is currently provided <br />a 33 toot right-of-way width from the centerline_ According to the submitted site pian, an <br />additional 7 feet of roadway width is to be provided via easement. The acceptability of <br />such easement should be subject to comment by the City Engineer and Anoka County <br />Highway Department. <br />Building Height. Within the R-1 zoning district, no church may be erected which exceeds <br />45 feet in height (Section 4, Subd. 9). Also to be noted is that church spires and cupolas <br />are excepted from such requirement. According to the submitted building elevations the <br />proposed church exclusive of the proposed cupolas and spires, is to measure 40 feet in <br />height and complies with the ordinance standard_ <br />According to the ordinance, accessory structures in the R-1 District may not exceed 16 feet <br />in height. As a condition of CUP approval, the applicant should demonstrate compliance <br />with this provision through the submission of a building elevation. <br />Building Materials.. According to the submitted building elevations, the proposed church <br />addition is to be finished in face brick which will match that of the existing structure. The <br />assembly area (sanctuary) roof is to be finished with standing seam metal. According to <br />the ordinance, buildings must be designed, constructed and maintained in an aesthetically <br />compatible manner. Finish materials of the proposed church addition have been found to <br />satisfy this requirement. <br />In regard to the finish materials of the proposed accessory building, R-1 District provisions <br />direct the following_ <br />No metal oonugated siding or roof. <br />Roof and exterior color and material compatible with home (principal building) <br />As a condition of CUP approval, the applicant must demonstrate compliance with the City's <br />accessory building material requirements in a manner judged acceptable by the City <br />Building Inspector. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.