My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/12/1994 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
1994
>
01/12/1994 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2017 12:21:55 PM
Creation date
7/7/2017 10:34:46 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/12/1994
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br />,( ST PAUL, MN <br />Cl MINNEAPOLIS, MN ❑ ST CLOUD MN <br />TO: Darrell Schneider <br />FROM: Steve Heth <br />DATE: January 5, 1994 <br />RE: <br />CHIPPEWA FALLS WI C MADISON WI <br />Lino Lakes, Minnesota <br />Engineering Review of Pheasant Hills Preserve Fifth Addition <br />SEH No. A-LINOL3336.00 <br />1. Preliminary Plat <br />A. Boundary does not close. <br />B. Bearing along east edge of Lot 1, Block 2, differs from bearing shown on Pheasant <br />Hills Third Addition. <br />C. Outlot A could be split and defined as easements to adjacent lots. <br />2. Grading and Drainage <br />A. Easements - Provide adequate drainage easements for lateral lot drainage on <br />Block 1, Lots 1, 2 and 3; Block 6, Lots 1, 2, 3, 4, 5 and 6; Block 4, Lot 2; Block 5, <br />Lot 1 and 4. Provide drainage and utility easement for storm sewer located on <br />Block 6, Lot 1. <br />B. Look -out or walk -out opening elevations are too low to fit the proposed contours <br />on the following lots: Block 2, Lots 1 and 3; Block 3, Lots 1, 2, 3, 4, 5, 6, 7, 8 and <br />10; Block 4, Lots 1, 2, 3, 4 and 5; Block 5, Lots 2, 3, and 4; Block 6, Lots 1, 2, 3, 4 <br />and 5. Correct house designation or proposed contours. <br />C. Recreation Trails - Proposed trail from Pondview Circle across Block 5 to <br />Timberwolf Trail as shown on approved Preliminary Grading Plan does not <br />appear. Please provide information as to why this trail was eliminated. <br />D. Typical Street Section - Current standard for location of private utilities in <br />common trench may be changing. Be aware that to new detail may need to be <br />used on final plans. <br />3. Sanitary Sewer and Water Main <br />A. Preliminary utility plan appears correct. <br />tlo <br />
The URL can be used to link to this page
Your browser does not support the video tag.