|
FER— 4-94 FR I 1 6 : 136 CI
<br />' JAN ' 9.4 14:12 MRTTKE ENG I1' : - G. INC.
<br />RICE CRUX WAT' .RSRIiD OXSTRIC'D
<br />SUITS 374, .MDZN KAA
<br />3585 LEXINGTON VENUS NOVTX
<br />MDE U HILLS, H/NOZsC TA 55126
<br />6x3302
<br />TO:
<br />iortio ?EMIT NO. 93-199
<br />cc: City of i.i�na takes
<br />t4opt$Cmery Watson
<br />Inspector Eklin
<br />itcwo File
<br />F - €'9
<br />e2
<br />93-139 Richaird S. Carlson
<br />. aa�uad toi Richard S. Carlson & Associates, 7671 Central Avenue NE, Fridley, MN 5543..
<br />Lecatiorix Northeast quadrant of Ware RCad and 62nd Street W, lino takes
<br />Purpaees Approval of Land Development and Wetland AlterattOrr Plans for a
<br />single-familyresidential• developm nt to be known as fflneridge II,
<br />19 tots on 1+ acres.
<br />At their meeting on r �nnb L, 19,9 ___, the Baird of isanagorz
<br />of tha Rico Creek Rateethed atetrl,ot reviewed yau: permit
<br />application and the recommendation Qt the District rn ginoar Nixed
<br />upon the following.exhi3>itq
<br />1. Permit application dated July 27, 1993.
<br />2. Letter prepared by Hattke Engineering. dated August 10, 1993, addressing wetlands.
<br />received August 11, 1993.
<br />3. Preliminary plat prepared by Mattke Engineering, dated August 10, 1993, received
<br />August 11, 1993.
<br />4. Grading and Drainage Phan prepared by llattka Engineering, dated August 10, 1993,
<br />received August 11, 1993.
<br />S. MPCA !Notice of Intent to Grade Area Over 5' Acres, doted August 20, 1993,
<br />recei ked Augu t 23, 1993.
<br />6. Letter prepared by Mattke Engineering, dated December 2, 1993, received
<br />December 2 1993, summarizing wetland impacts.
<br />7. Memo to fide from nate Drewry dated November 10, 1993, reCei wed november 1f1. 1993.
<br />verifying wetland classification.
<br />8. HEC -1 calculations for 1- and 10O -year storm runoff and ponding volutes,
<br />dated December Z 1993, received December 2, 1993,
<br />9. Skimmer calculations for outlet for west pond, dated December 2, 1993.
<br />received member 2, 1993.
<br />10_ Grading and sediment erosion control plan prepared by Mattke Engineering, last
<br />revised (ov er 28, 1993. received December 2, 1993,
<br />11. Cosh Surety in the amount Of $3,000 received Decreer $2, 1993.
<br />12. US Army Corpsof Engineers NatiOnwide Permit authorization letter dated
<br />December 20, 1993, received December 21, 1993.
<br />They found the project as planned to be in accordance with too
<br />Viso a aeguiatLons and Guideline(' of the District and thozefore
<br />approved the permit as requestedL with thea Following additional
<br />etipul,ations s ND ADDITIONAL STIPULATIONS
<br />xt is he: reaponsibillt' of the Pexmittea to pxc vlda 42.1, toeesu. is
<br />necaseary to contain sediment. on the 'site during conetructiast.
<br />Thit may moire the use of erosion control measurer not outlined
<br />6µ0d -w. I nreariN..i.•.
<br />EXHIBIT E
<br />
|