HomeMy WebLinkAbout10/12/1994 P&Z PacketCITY OF LINO LAKES
PLANNING & ZONING BOARD
AGENDA
October 12, 1994
6:30 P.M.
SCANNED
I. Call to Order and Roll Call:
II. Approval of Minutes:
September 14, 1994
III. Approval of Agenc - chancres/Additions
IV. OPEN MIKE:
V. ACTION ITEMS:
. 94-24-P, PUBLIC HEARING, K -G Development Inc.,
Preliminary Plat for the Woods of Baldwin Lake II.
B. 94-25-P & Z, PUBLIC HEARING, Gor-em LLC,
Preliminary Plat and Rezoning from Rural to R-1
Single Family for Clearwater Creek
94-26-P, PUBLIC HEARING, Hokanson Development,
Preliminary Plat and Rezoning for Marshan
Townhomes.
VI. DISCUSSION ITEMS: ��\ N ��
scc�sr- Or
.:e (t�� .:e T
Behm's Century Farms/Lino Air Park - Discussion
Accessory Building Ordinance
VII. ADJOURNMENT:
PLANNING & ZONING BOARD MINUTES
SEPTEMBER 14, 1994
CITY OF LINO LAKES
PLANNING & ZONING BOARD MINUTES
Planning
dinatga,
..............................
...............................
..............................
APPROVAL OF MINUTES: Ed Schones made a motion approving the
minutes of the July 13, 1994 meeting as submitted and was supported
by Al Robinson. All voted aye. Motion carried. Rick Gelbmann
abstained.
APPROVAL OF AGENDA: Item VI B pertaining to Behm's Century Farms
has been withdrawn.
OPEN MIRE: No one was present to address Open Mike.
PLANNING ITEMS:
A. 94-21-V, St. Joseph's Church, Elm Street, Sign Variance
Planning Coordinator Wyland reviewed this request which is to allow
the construction of an institution identification sign, 96 square
feet in area. The Code allows 24 square feet in area, therefore,
the variance is for 72 square feet of sign. The staff has
recommended denial for the reasons outlined in the staff report
dated 9-12-94.
Fr. John Fitzpatrick was present and indicated that there are 1600
families in the growing Parish, 6,000 individual members. There
are 10 - 15 new families per month and the church would like a
directional sign, on the freeway, to direct them. The church does
not have visibility on a major roadway and has asked the County and
State for permission to put up direction signs on Elm Street and
Lake Drive - but they have been denied. The proposed sign could be
a temporary thing because the church is anticipating expansion that
would include a steeple or tower that could provide a visual
directional symbol for the church. Dan Lasch was also present and
indicated that the sign could be temporary and removed in 5 years.
He also stated that the height would be approximately 13'. Mr.
Kirmis advised the Planning & Zoning Board that a Variance is
1
PLANNING & ZONING BOARD MINUTES
SEPTEMBER 14, 1994
granted as an ongoing development right and should be based on
unique characteristics with no time frame.
Al Robinson stated that he felt it was important for the church to
have the sign due to their limited visibility. The only visibility
the church has is from the freeway. A 24 square foot sign would
not work. Tom Mesich agreed with Mr. Robinson and stated that a
variance had been granted for a sign to FINA - why not the church.
There is a unique circumstance here. Chairman Schaps stated that
we should be directed by the Ordinance which calls for a 24 square
foot sign. Mr. Schones agreed with Mr. Mesich and Robinson that
this particular request did not seem unreasonable.
After further discussion Mr. Schones made a MOTION and was
supported by Al Robinson to approve the variance as requested with
the condition that a sign permit be obtained, the sign be at least
10' from the property line, and the height not exceed 14'. All
voted aye. Motion carried.
B. 94-22-S, Anoka County Detention Center, 4th Ave. & Lilac, Site
Plan Review
Planning Coordinator Wyland reviewed this request which is a site
plan review for the Anoka County Detention Center on 4th Avenue and
Lilac. The property currently contains two juvenile detention
cottages and a juvenile shelter. The request is to construct a 60
bed medium secure facility to house adult county prisoners serving
terms of less than one year.
Staff would recommend approval with the following conditions:
1. Proper building permits be obtained prior to construction.
2. Arrangements for sewer and water assessments be made prior
to issuance of any building permits.
3. Landscaping be as outlined on the plans.
4. Parking as provided on the plan and ADA approved.
5. Utility services as approved by the City Engineer.
A question was asked as to what type of criminal would be housed in
the facility. Mr. Jerry Schoma indicated that there are three
types. Those awaiting trail are housed in the main jail in Anoka.
Those being punished but not "unsafe" will be housed in this
proposed facility - they are 65% traffic violators, others are
property damage crimes. The third type are federal prisoners who
are jailed in Anoka. This particular facility will be between a
minimum and maximum security facility. Most offenders will be
serving 30 - 60 days. Mr. Schoma further explained that there is no
tax revenue generated from this facility. Funding will be coming
from the Federal Government via a prisoner exchange program and
from the County.
Mr. Schones stated that he appreciated the look of the facility -
it is not "prison" looking. Mr. Landers then made a MOTION and was
supported by Mr. Gelbmann to approve the request with the
conditions outlined by the staff. All voted aye. Motion carried.
2
PLANNING & ZONING BOARD M MUTES
SEPTEMBER 14, 1994
C. 94-23-P, Boe Ornamental, 484 Lilac Street, Minor Subdivision
Planning Coordinator Wyland reviewed this request which involves
the subdivision of Lot 3, Block 2, Lino Industrial Park into two
parcels which are then to be added to Lots 1 and 2, Block 2, Lino
Industrial Park. The staff has recommended approval of this minor
subdivision request.
After some discussion Al Robinson made a MOTION and was supported
by Tom Mesich to approve the minor subdivision as submitted with
the condition that the newly created lots be added to Lots 1 and 2,
Lino Industrial Park. All voted aye. Motion carried.
DISCUSSION:
A. Accessory Building Ordinance: Mr. Kirmis reviewed a staff
report, dated September 1, 1994, concerning Accessory Buildings.
A comparison was made between the Lino Lakes ordinance and the
ordinances of the City of Hugo, Lake Elmo and Circle Pines. Staff
recommendation included three options:
1. No policy change
2. Expansion of the 1 1/4 - 2 1/2 acre standard to include
lots 1 to 1 1/4 acre in size.
3. Adoption of a new standard, similar to that employed by
Circle Pines as outlined in the staff report.
Tom Mesich asked why Hugo, Lake Elmo and Circle Pines were used as
comparisons - why not Columbus Township, Blaine, and Forest Lake.
He indicated that he would like to see the 1 1/4 limitation dropped
down to one (1) acre.
Mr. Schones stated that this is a tough question and suggested that
we leave the ordinance stand as it is. He indicated that he likes
the open spaces, he does not want to have to look at a neighbors
800 square foot storage building. He also suggested tougher
enforcement on people with junk vehicles, etc. in their yards.
Kathy Nordine stated that in Washington County, when a property is
subdivided and their are outbuildings on the site they must be
removed as a condition of the subdivision. The City could consider
a similar requirement if the concern is for future subdivision of
properties with larger outbuildings. She added that the existing
ordinance seems to be fairly lenient.
Al Robinson stated that this has been an issue for many years. We
are between a rock and a hard place and should be able to come up
with some type of compromise. Maybe we should look at our
neighbors - Circle Pines, Columbus and Forest Lake.
Chairman Schaps suggested the Board give this matter some more
thought and possible review could be incorporated into the growth
study.
Mr. Neil Banta was present and advise the Board that Forest Lake
3
PLANNING & ZONING BOARD MINUTES
SEPTEMBER 14, 1994
allows two accessory building totalling 1500 square feet. Columbus
has no limit other than 1200 sq. ft. on an attached garage.
Shoreview allows a total of 1500 square feet.
Tom Mesich indicated that he would like some input from the
Building Inspector.
This item will be continued to the next meeting.
ADJOURNMENT: Upon the unanimous consent of the Board the meeting
was adjourned at 8:15 p.m.
4
STAFF ORIGINATOR
DATE
TOPIC
AGENDA ITEM V B
NAC - Al Brixius
October 7, 1994
PUBLIC HEARING - Clearwater Creek
Rezoning & Preliminary Plat
Background
Gor-em L.L. Corporation has requested preliminary plat approval of
a 157 lot single family subdivision entitled Clearwater Creek. The
subject 121 acre site is located east of Interstate 35E and south
•of Cedar Street.
To accommodate the proposed subdivision, a rezoning of the subject
property from R, Rural to an R-1, Single Family Residential will be
necessary.
Attached for reference:
Exhibit A - Site Location
Exhibit B Detailed Site Location
Exhibit C - Area Sewer Plan (February 1994)
Exhibit D Concept Plan
Exhibit E - Preliminary Plat
Exhibit F - Grading and Utility Plan
i775 Wayzata Blvd. Suite 555 -St. Louis Park, MN 55416 • (612) 595-9636•Fax. 595-9837
Recommendation
The proposed subdivision will open a new area of Lino Lakes up for
development. The successful development of the residential plat
will offer the City the opportunity to provide municipal utilities
to the I-35/County Road 14 interchange area opening areas of
commercial and industrial zoning up for economic development. This
prospect is keeping with the Lino Lakes 1990 Comprehensive Plan
amendment, the position set forth in the Lino Lakes/Centerville
annexation dispute, and the economic development objectives of the
City.
In preparing for this new development opportunity, the City has
undertaken the following studies:
TDKA: Area Wide Utility Feasibility Study
SEH: The Otter Lake Improvement and Alignment
OSM: In cooperation with the City of Hugo, the City is
participating in an area Storm Water Management
Study
These studies are anticipated to be completed in the near future.
Without this information, we believe that consideration of the
rezoning and preliminary plat is premature. We would recommend
continuing the public hearing on Gor-em L.L. Corporation's
development application until the City has received the
aforementioned studies to be reviewed in conjunction with the plat.
The following comments are offered in regard to the preliminary
plat design:
1. The following double frontage lots are reconfigured to provide
not less than 145 feet of depth:
Block 1, Lots 1--6
Block 7, Lot 1
2. Submission of a landscape plan will be required to illustrate
the screening of lots that about either Otter Lake Road or
Cedar Street. ($0.,-V
3. The following precautions are taken in the event that adjacent
southerly development does not' occur in the immediate future.
a. Those lots west of Street A which receive access from
Street E be excluded from the subject plat at this time
and be developed as a future phase in conjunction with
future southerly development.
b. Provision is made to provide a possible Street E loop
within the boundaries of the subject site.
2
4. A temporary cul-de-sac is provided at the southern terminus of
Street A.
u)
5. The City Engineer provide comment/recommendation in regard to a
street width requirements.
6. An access permit is obtained from Anoka County Highway to
accommodate the proposed County Road 89 access.
7. The submitted grading and drainage plan is subject to review
and approval by the City Engineer.
8. The submitted utility plan is subject to review and approval
by the City Engineer.
9. The Park Board provide recommendation in regard to park and
trail dedication.
10. All wetlands are delineated by a person recognized as
qualified to the DNR or Army Corps of Engineers.
11. All wetland related recommendations offered by the Army Corps
of Engineers, Rice Creek Watershed District, and City Engineer
are satisfactorily met.
12. If the subject development is to occur in phases, a phasing
plan is submitted. Such plan shall be subject to City
approval.
13. Comments from other City staff.
ISSUES ANALYSIS
Rezoning
As noted previously, a rezoning of the subject site from R, Rural
to R-1, Single Family Residential is necessary.
Judgement Criteria. In review of rezoning requests, the Planning
Commission and City Council should consider its possible adverse
effects. Judgement should be based upon, but not limited to, the
following factors:
a. The proposed action has been considered in relation to the
specific policies and provisions of and has been found to be
consistent with the official City Comprehensive Plan.
b. The proposed use is or will be compatible with present and
future land uses of the area.
c. The proposed use conforms with all performance standards
contained herein.
d. The proposed use can be accommodated with existing public
services and will not overburden the City's service capacity.
e. Traffic generation by the proposed use within capabilities of
streets serving the property. 2
Comprehensive Plan. The City's 1990 Land Use Plan suggests single
family residential use of the subject property. Such designation
is consistent with the property's inclusion within the municipal
urban service area. In this regard, the requested R-1 zoning is
consistent with the City's Comprehensive Plan.
Land Use Compatibility. To determine the appropriateness of the
proposed use, it is considered beneficial to examine adjacent land
uses and zoning designations.
Direction
North
South
East
West
Use
Undeveloped
Undeveloped
Undeveloped
I -35E, Undeveloped
Zoning
L -I, Light Industrial
R, Rural
NA - City of Hugo
R, Rural
(aoa_
10
As evidenced above, lands which surround the subject site lie
undeveloped, while the use in and of itself is compatible with
surrounding uses, some question obviously must be raised in regard
to the potential for premature development.
This issue will be addressed in the following section of this
report.
Public Services. To justify the requested rezoning, findings
should be made that the proposed use will not overburden the City's
service capacity. As noted previously, some question exists to
whether the proposed subdivision constitutes a "leap frog"
development as it lies physically isolated from the City's existing
urban core. In this regard, City Officials must consider the
following:
1.
The subject property is within the MUSA.
2. In past discussions defending possible detachment of the
subject property to Centerville, the City has indicated that
it holds the ability to provide services to the area.
3. According to the City Engineer, only a large development such
as that being proposed makes immediate sewer and water service
practical.
4. Provision of sewer and water to the subject site will create
a "domino" effect and make commercial and industrial
development in the area much more marketable. This concept is
endorsed by the Lino Lakes EDAAB.
5. The provision of sewer and water to the proposed plat will
also bring utility availability to the commercial and
industrial zoned areas around the I-35/County Road 14
interchange. This area of the City becomes more marketable
for economic development. This development and utility
concept has bee endorsed by the EDAAB.
6. The applicant has worked closely with the area property owners
to assemble land and gain consensus with a regard to the
development concept.
Currently, the City's consulting engineer, TKDA, is preparing an
area -wide utility feasibility plan that would encompass the I -35E
interchange area and the proposed Clearwater Creek plat. This
utility feasibility study is anticipated to be completed by the end
of October. We would suggest that it would be premature to
consider the requested rezoning without the availability of the
utility study. Once the study is received, the findings as to the
plat's impacts on community utilities can be made.
Traffic Generation. In August of this year, the City's consulting
engineer, SEH, reviewed the Clearwater Creek concept plan (Exhibit
D) in regard to traffic related issues. In review of the five
phase, 456 lot development proposal, it was estimated that:
o 2,950 trips per day would utilize County Road $4 south to the
County Road J interchange.
Lt1e..t ?.4
o Almost 1,600 trips per day will utilize County Road 14 to the
north.
O 150 trips will travel east to Elm Crest Avenue to either the
east side of Bald Eagle Lake or Bald Eagle Boulevard.
The review concluded that traffic ,volumes generated by the
development will not create -significant traffic problems.
While the proposed preliminary plat constitutes only the first
phase of the development under review by the consulting engineer,
it can be concluded that traffic generated by the proposed use is
within the capabilities of streets which serve the subject
property.
SEH is currently studying the Otter Lake Road corridor to offer
recommendation as to street improvement and future connection with
County Road 14. This study is also anticipated to be completed by
5
the end of October. The findings of this study may provide
additional information as to the traffic patterns associated with
this plat.
Performance Standards. As a condition of preliminary plat
approval, the proposed development will be required to comply with
applicable performance standards. Compliance with City development
standards will further be evaluated in the preliminary plat review.
Preliminary Plat Review
In addition to the rezoning request, the applicant has requested
simultaneous preliminary plat approval of the Clearwater Creek
subdivision. In referenced to the previously submitted sketch
plan, the preliminary plat under review constitutes the first phase
of a multi -phase development.
Blocks. According to the Ordinance, the maximum length of blocks
shall be 1,500 feet. All proposed block lengths have been found to
comply with City block length requirements.
Density. Within R-1 Zoning Districts, the maximum number of
dwelling units per buildable acre must not exceed 3.2. With a
total of 157 dwelling units being proposed upon the subject 55
buildable acres (121 acres less 66 acres devoted to wetlands), the
density of 2.9 units per acre is being proposed.
Lot Area. Within R-1 Zoning Districts, a minimum lot area of
10,800 square feet must be provided (exclusive of wetlands). the
submitted preliminary plat identifies the gross and net areas of
all proposed lots. In review of the plat, all proposed lots have
been found to meet minimum R-1 District lot area requirements.
Lot Width. In the R-1 District, interior lots must provide not
less than 80 feet of width. Corner lots in the district must not
provide less than 105 feet of width. All proposed lots have been
found to meet or exceed R-1 lot width requirements as measured from
the setback line.
Lot Depth. In the R-1 District, a minimum lot depth of 135 feet is
required or 145 feet if a lot has double frontage. Lot depths are
measured by taking the average length of the two side property
lines, as homes are typically constructed in the middle of lots.
In review of the submitted preliminary plat, a number of double
frontage lots fail to provide the required 145 feet of depth.
Specifically, the following lots provide insufficient lot depths:
Block 1, Lots 1-6
Block 7, Lot 1
6
The aforementioned lots should be reconfigured to conform to R-1
lot depth requirements.
The applicant should provide a detailed landscape plan that would
illustrate screening of the rear and side yards of double frontage
lots and corner lots that abut collector or arterial streets.
Specifically, we would recommend screening the following areas:
Block 1, Lots 1-6 rear yards and Lot 22 side yard
Block 2, Lot 1 side yard along Cedar Street
Block 7, Lots 1-4 rear yards along Otter Lake Road
Setbacks. The following table illustrates the minimum setback
requirements within the R-1 Zoning District:
Front Yard
Side Yard
Rear Yard
30 feet
10 feet
30 feet
All proposed lots hold an ability to meet applicable R-1 setbacks.
Streets. Generally speaking, the proposed street layout is
consistent with that illustrated upon the previously submitted
sketch plan and offers a positive circulation pattern. There are,
however, a number of items which should be addressed as identified
below:
1. Street E. Street E, as identified on the preliminary plat, is
at some future point intended to provide a southerly loop
connection to Street A. This connection is, however,
contingent upon development of property south of the subject
site. Essentially then, Street E will exist as a 1,200+ foot
long cul-de-sac until southerly development occurs. In this
regard, some precautions should be taken in the event that
southerly development does not occur in the immediate future.
Specifically, the following steps are recommended:
a. Those lots west of Street A which receive access via
Street E be excluded from the subject plat and be
developed as a future phase in conjunction with future
southerly development.
b. Some provision be made to provide a potential Street E
loop within the subject site, should southerly
development not occur.
2. Temporary Cul -De -Sacs As a condition of subdivision approval,
a temporary cul-de-sac will need to be constructed at the
southern terminus of Street A. Temporary cul-de-sacs must be
constructed at the full dimension of a permanent cul-de-sac.
To avoid the need for a temporary cul-de-sac, the applicant
may choose to plat Lots 12 and 13 of Block 5 as outlots for
7
future development phases. These lots then may be platted
with the future development of the land to the south per the
concept plan, or if the applicant chooses to loop Street E
back to Street A in response to previous staff suggestions.
3. Street Widths. In conformance with City standards, all
streets have been provided 60 feet of right-of-way (for
designated local streets). Of particular issue in this matter
is the appropriate classification of Street A. In review of
the previously submitted site plan, it is obvious that such
street will be a carrier of relatively high volumes of
traffic. In this regard, the City Engineer should provide
recommendation as to the need for additional right-of-way
dedication.
4. Access. The subject property is to receive access from the
west via County Road 84 and from the north via Cedar Street.
As a condition of plat approval, a County Road access permit
must be obtained from the Anoka County Highway Department.
Grading and Drainage. In accordance with subdivision regulations,
a grading and drainage plan has been submitted for review. The
said plan will be subject to review and approval by the City
Engineer.
The drainage patterns in this area of Lino Lakes flows east into
Hugo then returns to Lino Lakes via Clearwater Creek. As is the
case with the area utilities and street improvements, an area Storm
Water Management Plan is also being prepared in cooperation with
the City of Hugo. The result of this study directly affects this
proposed plat. We would recommend that the City continue the
preliminary plat public hearing to allow this study to be completed
in order to properly evaluate the storm drainage aspects.
Utilities. A utility plan has been superimposed on the submitted
grading and drainage plan (Exhibit F). This plan shall be subject
to review and approval by the City Engineer.
The acceptability of the proposed utility plan will be evaluated
against the area -wide utility feasibility study currently being
prepared by TKDA.
Park Dedication. Per the City's Park Dedication Ordinance, the
applicant is required to dedicate 10 percent of the land or cash in
lieu of a land dedication. In satisfaction of these requirements,
the applicant has proposed the dedication of 36.13 acres of
park/trail land. The acceptability of this dedication should be
subject to comment/recommendation of the Park Board.
8
Wetlands. The subject site contains a total of eight individual
wetlands which overlay approximately 66 acres of land. The
applicant is proposing to fill approximately .56 acres of wetland
to accommodate development. As a condition of preliminary plat
approval, the following wetland related conditions will be imposed:
1. All wetlands must be delineated by a qualified person
recognized by the DNR, Army Corps of Engineers, etc.
2. Recommendations of the Army Corps of Engineers, Rice Creek
Watershed District, and City Engineer relating to wetlands are
satisfactorily met.
Phasing Plan. If the subject development is to occur in phases, a
specific phasing plan must be submitted. The phasing plan shall be
subject to City approval.
CONCLUSION
With a number of studies pertinent to this subdivision being
outstanding, we do not believe sufficient information is available
to properly evaluate this development proposal. We understand that
the various engineers' reports will likely be concluded prior to
the November Planning Commission meeting. As such a continuation
of the public hearing is recommended.
pc:
John Powell
Randy Schumacher
Gor-em L.L. Corporation
9
NORTH
1 MILE
CITY OF LINO LAKES
MINNESOTA
EXHIBIT A - SITE LOCATION
RE
NEIL miskliti. .. ao
•
'C��.3 G00 s ,� 7GZGr
El Oreirdeat,,,
2 .,
Ara
�a�a 1 'v . o o `e
.9 +• . to DO 1/
E" "41 RD bill
ms :l 1111�
lijitessitta
Ea
IPM
i
Its
wadi%
-o" 0' C[..[w
' 'rvaJsrmac
•. I•
PARK,
1
24
LI i
•
Nifit
�.
r
i
lb
a
i
7200
7100
7000
-- 6900
1
ov,
•
c
rr6Px
41/4v11
O
0
0
0
. I0
•
A
6800
6700
6600
6500
6400
6300
6200
W
Ise
EXHIBIT B - DETAILED SITE LOCATION
COMPREHENSIVE
SEWER PLAN
SEWER DISTRICT
NO. 3
A
Oj�� LP E
orT�.
- EXHIBIT C - AREA SEWER PLAN
CLEARWATER •CREEK
PRELIMINARY PLAT
cr•Nto•—• -
LOCATION toAlt
1.01 ••••
DEVELOPER:
10732 HANSON BLVD
COON RAPIDS, MN. 55433
(612) 755-6554
to NI T0TAL oALA cf,or
AtI A.( CAA0540( Of •LTTA...5
flLA'OAfl1OI(TIUJO
0(1C(irt.•
1/• A.
t( 1.tia of 700 C 1/0 .0
r:f70 . SVC01/:: 7
0
1
.0AA 00N.To. totoo(10,
Vorrt • of 33 ono,
•
(01..A • ....Ns
CPAPWC SCALE
• .
6105150
Lod Surreyor. & Civil Engineers. 11071.
101 IISTATE (
PH.SE
.PHAsE II 9 9
FT-
-r1 r
<..o ..•, INTERSTATE.=.b
NISIjWAT._
\ /
/
_dl "_D,EST .
—
a�a SE'y 9_Cj-
e5E :' C V
DEVELOPER:
TY'Y EYYIRICH CONSTL'CTTON
2619 COON RAPIDS BLVD.
COON RAPIDS, %N. 53433
(812) 755-8554
•
CLEARWATER CREEK
PRELIMINARY GRADING & UTILITY PLAN
LOC.,
DEVELOPER: • ' • ' • •
• ' ' •.•.•
:•:':•:•:•.'.•
Cor -em, LLC.
10732 RANSON BLVD
COON RAPIDS, SLN. 55433
(812) 755-8554
STANDARD STREET SECTION
MCI 10 SCF.
• . • • - •
.. • . • . . • . • • •
•
0 • ft.,.
: • : • '• : • : •
. . .
KOMP.:PO,
./• ,/, ..c
02
SICRon 21, 1, 2, •
POCK ENTRANCE DETAL
•42 TO
N
TYPICAL 5210 FENCE INSTALLATION
RI:Dv-EST
Land Surreyors de Clvil Eng inecrf. IDC.
=SEN
October 6, 1994
Ms. Mary Kay Wyland
City of Lino Lakes
1189 Main Street
Lino Lakes, MN 55014-2123
Dear Mary Kay:
3535 VADNAIS CENTER DRIVE, 200 SEH CENTER, ST PAUL, MN 55110 612 490-2000 800 325-2055
ARCHITECTURE • ENGINEERING • ENVIRONMENTAL • TRANSPORTATION
RE: Lino Lakes, Minnesota
Clearwater Creek Phase I
SEH No. A-LINOL9507.00
We have completed our review of the preliminary plat for Phase 1 of the Clearwater Creek
development. The following is a list of our comments and concerns.
Preliminary Plat
• Lots 19 through 21 in Block 7 do not satisfy the minimum area requirement.
• A 20' drainage easement should be provided along the east side of Lots 13 through 16
in Block 4 to facilitate lateral drainage.
• Lots 1 and 2 in Block 6 do not satisfy minimum width.
• Lot 22 in Block 7 does not satisfy minimum depth.
• A 20' drainage easement should be provided along the west side of Lots 1 through 6 in
Block 4 to facilitate lateral drainage.
• Provide drainage easement for pond adjacent to Lots 16 through 20 in Block 3.
• Provide drainage easement for pond adjacent to Lot 8 in Block 1.
• Provide drainage easement for storm sewer and pond adjacent to Lot 1 in Block 6.
• Provide 20' easement for storm sewer adjacent to Lots 5, 24 and 25 in Block 5.
• Provide drainage easement for storm sewer under trail adjacent to Lots 9 through 12,
Block 1.
SHORT ELLIOTT
HENDRICKSON INC. MINNEAPOLIS, MN ST CLOUD, MN CHIPPEWA FALLS, WI
MADISON, WI
Ms. Mary Kay Wyland
October 6, 1994
Page 2
Sanitary Sewer and Water Main
• Lift station at intersection of Street "A" and Cedar Street must be sized to comply with
City staff study for this area.
• Sanitary sewer in Street "A" must be sized to comply with City staff study for this area.
• Water main in Street "A" must be sized to comply with City staff study for this area.
• A municipal well must be constructed to provide water for this plat. The production
goals for this well and the location must comply with the City staff study for this area.
• We recommend that the water main in Street "A" be looped to connect with the water
main in Street E along the south boundary of the plat.
Streets and Storm Sewer
• Compliance with City of Hugo storm water management plan must be proven.
• Provide discharge control from southwest corner of Block 7 for waters exiting plat
boundary.
• Developer to provide us with surface water piping and ponding calculations.
• Street "D" cul-de-sac has less than .5% slope around curb line.
• Street "I" cul-de-sac has less than .5% slope around curb line.
• Street "G" cul-de-sac has less than .5% slope around curb.
If you have any questions concerning this review, please call me at 490-2081.
Sincerely,
Short Elliott Hendrickson Inc.
Steven F. Heth, P.E.
tlo
c: John Powell, City of Lino Lakes
Don Volk, City of Lino Lakes
AGENDA ITEM V C
STAFF ORIGINATOR NAC - Al Brixius
DATE October 7, 1994
TOPIC PUBLIC HEARING - Marshan Condominiums
Rezoning & Preliminary Plat
EXECUTIVE SUMMARY
Background
Hokanson Development Inc. has submitted a preliminary plat
application for Marshan Lake Townhomes to construct 18 buildings,
totaling 216 units on a 23.9 acre parcel of land. The overall
density of the development is 9..04 units per acre. The applicant
•is also requesting a PDO, Planned Development Overlay District to
allow flexibility in the City's street requirements. Further, the
applicant is requesting a rezoning of a 1.6 acre parcel from the
current R-4, High Density Residential District to GB General
Business. The subject property is located at the intersection of
Lake Drive and Aqua Lane, on Marshan Lake which is classified as a
Natural Environment Lake.
Attached for reference are the foliowing exhibits:
Exhibit A - Site Location
Exhibit B - Preliminary Plat
Exhibit C - Preliminary Grading, Drainage & Utility Plan
5775 Wayzata Blvd. • Suite 555 -St. Louis Park. MN 55416 • (612) 595-9636•Fax. 595-9837
Recommendation
Based on the following review, our office recommends the following:
1. While the proposed rezoning of the 1.6 acre parcel from the
current R-4, High Density Residential District to GB, General
Business is consistent with policies outlined in the Lino
Lakes Comprehensive Plan, it is the position of our office
that decisions regarding land use and zoning are policy
matters to be determined by City Officials. Our office does
recommend that if the City feels that the rezoning of the
property is appropriate, it should only be rezoned in
conjunction with final plat approval of the Marshan Townhomes
project.
2. Due to insufficient information submitted for the preliminary
plat application our office cannot recommend approval. In
order for our office to review any proposed preliminary plat,
the applicant must submit a plat which includes all proposed
lots and blocks, including the proposed park and business
district.
3. In regard to the Planned Development Overlay/site plan review,
we find that the proposed site design attempts to maximize the
development potential of the site through the use of private
street and housing design that fails to comply with the R-4
green space requirements, exclusive of the dedicated park
land. The result is a site that is is over -utilized,
presenting concerns for traffic circulation, open space, and
parking.
Above the City regulations, we have been informed by the DNR
that upon notification that the City must update its shoreland
regulations, any development that is defined as a PUD under
the new State Shoreland Statutes, must be reviewed by the DNR
and comply with the new standards.
Based on our review, the proposed site plan does not comply
with all City performance standards and does not meet the
State shoreland standards. Under these conditions, we cannot
recommend approval of the PDO or site plan.
The City is currently updating it Shoreland Ordinance in
compliance with State Statutes. As part of this update, the
City is requesting flexibility from a number of State
shoreland performance standards specifically related to
development density and multiple family development. To avoid
the strict enforcement of the current State standards, we
would advise the applicant to pursue site development after
the City finalizes its Shoreland Ordinance update.
2
ISSUES ANALYSIS
Rezoning
As mentioned previously, the applicant is requesting a rezoning of
a portion of the subject site (1.6 acres) from R-4, High Density
Residential to GB, General Business. The purpose of the request is
to construct a small convenience shopping mall for local residents,
including the proposed multiple family development.
Rezoning Evaluation Criteria. In review of rezoning requests, the
Planning Commission and City Council should consider the possible
adverse effects of the proposed use. Judgement must be based upon
(but not limited to) the following factors:
1. The proposed action has been considered n relation to the
specific policies and provisions of and has been found to be
consistent with the official City Comprehensive Plan.
2. The proposed use is or will be compatible with present and
future land uses of the area.
3. The proposed, use conforms with all performance standards
contained herein.
4. The proposed use can be accommodated with existing public
services and will not overburden the City's service capacity.
5. Traffic generation by the proposed use within capabilities of
streets serving the property.
Comprehensive Plan. The existing land use plan, as contained
within the Comprehensive Plan designates the subject site as high
density residential. A goal within the Plan is to consolidate
commercial areas, rather than having them scattered throughout the
City. Commercial land uses are described in the Plan as follows:
The location of commercial land use in a community is a
sensitive issue because of the intensity of activity at
commercial areas. Commercial areas tend to attract
extensive traffic, generate noise and other forms of
pollution as well as being major employment and tax
generators for the community. If not carefully located
they can create traffic problems, visual blight, and
adversely effect residential areas. The types of
commercial services anticipated to locate in Lino Lakes
in the foreseeable future are: neighborhood shopping
centers, general service type businesses and highway
convenience commercial establishments. Commercial land
use requires a high degree of accessibility and
visibility. For this reason, areas close to the
3
intersection of major roads have been identified as
commercial land use areas. Commercial land use types are
proposed to be consolidated into nodal areas rather than
in long linear strips.
Because of the potential traffic problems that this strip
commercial is likely to cause, the City has chosen to
eliminate it where feasible and replace it with a few
larger areas located near intersections. Consolidation
in concentrated areas allows for:
• Safer and more functional vehicular control (fewer
access interruptions along city thoroughfares.
• Efficiency - reduced shopping trips by combining
many commercial businesses into one general area
for potential one-stop shopping.
• Minimization of potential conflicts with adjacent
land use by minimizing the number of edges between
commercial and residential property.
Based on the preceding information, a re -zoning of a portion of the
property to GB, General Business is consistent with the
comprehensive plan. The site is located adjacent to an existing GB
District, the proposed Marshan Townhome development will provide a
good transitional zoning area, and the property is located on a
highly traveled roadway.
Compatibility. The Zoning Ordinance stipulates that the proposed
use should be compatible with present and future land uses in the
area. In determining the acceptability of the proposed zoning
amendment, it is beneficial to examine surrounding land uses. The
following is a listing of uses and zoning designations which
surround the subject site:
Direction Use Zoning
North Residential (Single Family Homes) R-4
South Paint Distributer/Computer Sales GB
East Undeveloped R-4
West Residential (Medium Density) R-3
As indicated above, the surrounding land uses include high density
residential, and businesses with GB zoning, therefore, may be
considered consistent with the surrounding land uses. Should the
City approve the rezoning, any business development on the site
would have to provide adequate screening and landscaping to provide
a buffer to the single family homes to the north.
4
Performance Standards. The rezoning evaluation criteria stipulates
that the proposed use must conform to all applicable performance
standards cited within the Ordinance. The applicant has not
submitted specific plans to develop this site, however, when a
proposal is submitted it will be required to meet all applicable
performance standards outlined within the Lino Lakes City Code.
Area Depreciation. Development of the site with a small commercial
development should not depreciate the value of the surrounding
uses.
Public Services. Public utilities are available to the site, and
should not overburden the City's service capacity (i.e., police,
fire, utilities, etc.). This item is subject to review and
approval by the City Engineer.
Traffic Generation. The traffic generated from a 1.6 acre
commercial development should not negatively impact traffic on Lake
Road, which is highly traveled roadway.
Planned Development Overlay/Site Plan Review
The submitted site plan calls for construction of eighteen (18)
individual structures upon a single property, with construction of
private roadways on the site. As such, a Planned Development
Overlay District application is required. Under the PDO
application, conventional R-4 requirements may be waived under
certain circumstances.
Overall the site design is crowded, roadway widths and green space
are compromised in order to maximize development potential of the
site. Seventy five percent (75 percent) of the site is made up of
impervious surfaces. The proposed site plan provides little green
space among the housing units, relying totally on the public park
for open space. The crowded design raises question as to the
desirability of the residential environment being created.
Additionally, the City has been informed by Ed Fick of the DNR,
that Lino Lakes is required to update its shoreland regulations per
a state mandate. As such, all development proposals that are
defined as PDO under State regulations within the Shoreland
District, must meet all State Shoreland Regulations. Therefore,
this application is subject to review an approval of the DNR.
Density. The submitted site plan proposes 216 dwelling units upon
23.9 acres of land resulting in a gross overall density of 9.04
units per acre. Section 6, Subd. 8 2.E.iv.a. of the City Code
restricts the density of multiple family residences to a maximum of
15 per acre, therefore, the 29.9 acre parcel is limited to 448
units. As mentioned, the proposal is for 216 units or 9.04 per
acre, therefore, meets the Code requirement.
5
In judging the development proposal against the State Shoreland
Regulations, the proposal does not meet the density requirement of
2.09 units per acre for development on a Natural Environment Lake.
The DNR has stated that the proposed subdivision will be held to
the State Shoreland Regulations.
The City is currently in negotiation with the DNR, as part of the
Shoreland Ordinance update, to allow a density greater than the
existing State Regulations in the City's Shoreland District.
However, until the City formally adopts the amended Shoreland
Ordinance, the State can pose its regulations.
Building Setbacks. To ensure compatibility with adjacent uses, all
R-4 perimeter setback requirements should be maintained. As shown
below, all exterior setbacks comply with R-4 standards.
Front Yard
Side Yard
Nat. Env. Lake
Required Proposed
40 feet 70 feet
20 feet 45 feet
100 feet 170 feet
Section 6, Subd. 8.E of the Zoning Ordinance stipulates no
structures maybe closer than 36 feet to another building. The
proposed building placement conforms to this separation
requirement.
Building Design. Prior to final project approval, "typical"
building elevations and floor plans should be submitted which
identify structure height, finishing materials, and proposed
dwelling unit areas. All dwelling units must meet minimum floor
•Area requirements stipulated in the Ordinance.
Streets. Condominiums within the proposed subdivision will gain
access off of an extension of existing Stage Coach Trail. The
developer is proposing an interior street arrangement off of Stage
Coach Trail that will consist of private streets. Section 302.03
(10) of the Lino Lakes City Code specifically prohibits
installation of private streets, however, under the PDO private
streets may be allowed. In 1992, the City granted approval of
private roadways within the Lino Lake Cottages development.
However, Lino Lake Cottages is an elderly development which did not
expect much traffic. The purpose of utilizing private streets in
this instance, is to reduce the right-of-way area in order to
increase the number of housing units on site.
The proposal is for three main interior streets to gain access off
of Stage Coach Trail. These roadways are to be paved 32 feet wide
from curb -to -curb. Additional roadways will be constructed off of
these three main roads and will function as driveways and be
constructed 28 feet wide from curb to curb.
6
City Code requires that local streets have right-of-ways of at
least 60 feet, while the proposed right-of-ways are 32 and 28 feet.
The proposed paving of the 32 foot wide streets meets City Code,
however, the 28 foot wide streets do not.
Concern is raised over the design layout of the proposed streets.
The seventy two (72) units north of the park, will be reliant upon
a single cul-de-sac. The development south of the park is accessed
by two roadways off of Stage Coach Trail, the paved portion of the
roads are set just 20 feet back from the structures.
City Code suggests that where feasible and practical, all roads and
parking areas shall meet a 100 foot setback from any ordinary high
water mark. In several locations the proposed construction of
Stage Coach Trail will be within the 100 foot setback. It may be
difficult to avoid locating the road within the 100 foot setback
area due to the existing location of Stage Coach Trail. The
applicant could angle the road away from Marshan Lake, however,
this may result in a loss on townhomes.
Off -Street Parking. According to Section 8, Subd. 1.(2)(B), an
off-street parking requirement of two and one-half spaces per unit
is required in the R-4 Zoning District. As calculated below, a
total of 540 spaces is required.
Units
Parking
Ratio Requirement
216 2.5 per dwelling unit
540
The subject proposal illustrates 416 designated parking spaces,
including 288 indoor garage spaces, and 128 outdoor spaces. Thus,
the proposed off-street parking supply is considered insufficient.
However, the City has allowed tandem driveway parking (in front of
-indoor garage) to be counted as parking spaces. An example was the
Lino Lakes Cottage development.
Within Lino Lakes Cottages, driveway stalls were included due to
the fact that the development was geared toward the elderly (55 and
over only), and that no storage of recreational vehicles was
allowed. If driveway parking is counted in the total for the
subject development, an additional 288 spaces would bring the
parking spaces to 704, which would meet'the City Code. However,
the proposed development does not pose any occupancy restrictions,
therefore, our office recommends that adequate parking should be
provided which does not include tandem parking.
According to Section 8, Subd. 4 of the Zoning Ordinance, all off-
street parking areas must be designed in conformance with the
following performance standards:
• Bituminous Surfacing
• Perimeter Curbing
• Parking Lot Lighting
7
• Striped Stalls
• Designated Handicapped Parking Stalls (1 per 50 stalls is
required)
The site plan does not specify how these items will be addressed.
Park Dedication. The density of the proposed subdivision is 9.04
units per acre, therefore, the applicant is required to dedicate 18
percent of the entire 29.9 acre subdivision for park dedication.
Park dedication may take the form of 18 percent of the land within
the subdivision or a cash in lieu of land contribution in the
amount of 18 percent of the fair market value of the land.
Eighteen Percent (18 percent) of the entire area is 5.38 acres.
The applicant is proposing to dedicate a 3.8 acre lot to the City
for park purposes. The Lino Lakes Park Board shall review the
subject proposal and make a recommendation.
Open Space. According to Section 6, Subd. 8.2.E.(iv.)(c) of the
Lino Lakes Zoning Ordinance, at least 35 percent of the site must
be devoted to green grass or open space. The applicant is
proposing 5.97 acres of green area within the 23.9 acre development
or 24.9 percent, which does not meet the City's minimum
requirement. The lack of green space may be attributed to absence
of road right-of-way, as the entire area within the road right-of-
ways will be paved. As mentioned earlier, the applicant is
proposing to locate as many townhomes as possible on the site, at
the expense of green space and road right-of-ways.
The parcel which is to be dedicated to the City for park dedication
purposes does not count toward the open space requirement. In
order to meet the minimum requirement the applicant must provide a
revised site plan which includes an additional 2.39 acres of green
-space.
In a comparison of State Regulations which require 50 percent of
the total project area to be preserved as open space, the proposal
of 24.9 percent again falls short of the requirement.
Structure Land Coverage. According to Section 6, Subd. 8.2.E.(iv.)
(b) of the Lino Lakes Zoning Ordinance, the area covered by any
structures shall not exceed 35 percent of the total land area. The
applicant is proposing 4.54 acres of green area within the 23.9
acre development or 19 percent, which meets the City's minimum
requirement.
Outlots. the proposed site plan indicates a strip of land between
the Stage Coach Trail right-of-way and the ordinary high water line
of Marshan Lake. However, there is no stated intention for the use
of this land. This area will likely be platted as an Outlot. When
the applicant submits a revised preliminary plat, a written
statement of intention of the use of this land should accompany the
proposal for review and approval of the City.
8
Landscaping. All property lines that abut a public right-of-way
and R-1 Zoning District must provide a landscape buffer area not
less than 20 feet in depth. The proposal does indicate adequate
landscaping area along Lake Drive and the northern property line
which abuts an R-1 district. However, the applicant has not
submitted a landscape plan. Therefore, on the revised site plan,
a detail of proposed landscaping should be submitted.
Trash Handling. Section 6, Subd. 84.D. of the City Code states
that all garbage containers must be placed at the rear of the
premises, and may not be placed next to the street or curb or shall
they be placed to interfere with use of adjoining property or cause
a nuisance. Garbage areas must be screened from eye -level height.
The site plan does not identify trash handling areas, therefore,
the revised site plan should indicate all trash handling areas.
These areas must also be demonstrated to be accessible to trash
handling equipment.
Snow Removal. The applicant must submit a snow removal plan
identifying snow storage areas. Snow storage area may not take up
any required parking spaces.
Grading and Drainage/Wetlands. In accordance with subdivision
regulations, the applicant has submitted a grading and drainage
plan for review. All wetlands are to be protected with drainage
easements. In addition, all building pad elevations should be at
least three (3) feet above the high water level of the wetlands.
Said plan is subject to review and approval by the City Engineer.
Utility Easements. The applicant has submitted a utility plan that
is subject to review and approval of the City Engineer.
Development Agreement. As a condition of preliminary plat approval
the applicant shall enter into a developers agreement with the
City.
CONCLUSION
Based on the information contain within this report, the following
may be concluded:
1. If the City feels that the rezoning of the 1.6 acre parcel is
justified, the formal rezoning of the property should be
reviewed in conjunction with final plat approval of the
Marshan Townhomes project.
9
2. The applicant has submitted insufficient preliminary plat
data, therefore, the applicant must submit a plat which
includes all proposed lots and blocks, including the proposed
park and business district prior to any formal recommendation.
3. In regard to the Planned Development Overlay (PDO)/Site Plan
review, the proposal does not meet performance standards
within the R-4 Zoning District or the State shoreland
standards for PUD, therefore, our office recommends the
request not to be approved. If the applicant wishes to pursue
development of the site, a revised site plan should be
submitted that meets the development standards.
pc: Mary Kay Wyland
Randy Schumacher
Kirk Corson
10
H O R T H
1 MILE
CITY OF LINO LAKES
MINNESOTA
VUtr1T A CIT17 1 (\C'NT I(1p1
w'
/
/
Opal
Asti
♦yam
•
11 ACK
SHORES
PARK
•
7
1
apt
imp.sta
41
IMARSHAN LAKE
3 POST ROAD
5
i
4
4
i
3 i1!l
'+e'0 5 1
/
F
i
r
2
12
14
yVAP
am,
t
/1
>,//
•
474) Jf 414 444
*ZIP Artr,l � x,411 11110/0.
a7Itf eke
dibeibb
LLi�i� 3
G` 7�r77
i
'�...+_ J
/ y
dibusIbn
G` 11� +:w
�P!— ii#�'ir
iiiiEMIT
Eno
WW1 MEW NW
I
U 1111111
Ilir
ALL
:T■��^i'FT fi�
!_o l211ii� w1IEZP
! 511 VW JL
II
ii
it
+II
i/
it
/1 1
i;
3
3
AQUA LANE
TvniC,l >uT*(D *OMNnCu( lQT
T—o-'
1 ffilhodhli
i Lrlq/ice t��il
i
10.
17f L
EXHIBIT 8 - SITE PLAN
7
O
0
F
z
0
Q)
lig
!I
jC
1 .Kfa /1/41-'
ELM ST.
i
SHURES
FARK
0t MARSHAN
I �\
144
LAKE
POST ROAD
r •1 r
A
5 4 3
1
_..��
0
ye,
12
5 13
z
J
Q
7.1
• II
14
nWovivC LOT
11 IVO
i
•/
/ i
/ /
r
'
—
WI 1
—cam_ -
v.
AQUA LANE
R'VIN(Mlt 9rrp•.1"111,1 IP Mt
•
GRADING & DRAINAGE
u1
September 29, 1994
Ms. Mary Kay Wyland
Planning Coordinator
City of Lino Lakes
1189 Main Street
Lino Lakes, MN 55014
Re:
OSM
Marshan Lake Townhomes
City of Lino Lakes
OSM Project No. 5521.00
Dear Ms. Wyland:
Orr
Schelen
Mayeron&
Associates, Inc.
300 Park Place Center
5775 Wayzata Boulevard
Minneapolis, MN 55416-1228
612-595-5775
1-800-753-5775
FAX 595-5774
Engineers
Architects
Planners
Surveyors
We have reviewed the grading/drainage/utility plan for the above -referenced project (dated
6/14/94 as prepared by R. Nelson Engineering) according to the City of Lino Lakes
Subdivision Application Checklist and Engineering Standards, and offer the following
comments:
Sanitary Sewer
1. Each of the proposed townhome units shall be serviced individually.
2. The plan should provide sanitary sewer service to the exception area adjacent to
Lake Drive and north of the proposed general business zoning area.
• 3. The proposed sanitary sewer line extension along Stagecoach Trail across Aqua Lane
should be deleted. The existing forcemain and gravity sanitary sewer outlet for the
Marshan Lake Townhome project will be at its capacity when this development is
completed. No additional sanitary sewer capacity is available for future development
to the south of Aqua Lane along this route. The feasibility report for the Marshan
Lake Townhome project should consider the impacts of the development on sanitary
sewer capacity for this area.
Watermain
1.
Each of the proposed townhome units shall be serviced individually.
2. The plan should provide watermain service to the exception area adjacent to Lake
Drive located to the north of the proposed general business zoning area.
3. The 1991 City of Lino Lakes Comprehensive Water study delineates 12 -inch trunk
watermain lines along the western border (Lake Drive) and southern border (Aqua
Lane) of the Marshan Lake Townhome project. These trunk watermain lines will
need to be constructed as part of the Marshan Lake Townhome project.
J:\5521.00\CIVIL\CORRES\092994.MKW
Equal Opportunity Employer
Ms. Mary Kay Wyland
Planning Coordinator
City of Lino Lakes
September 29, 1994
Page 2
4. As part of the Wenzel Farms Townhome project (located to the west of the Marshan
Lake Townhome project), an eight -inch watermain stub was constructed on the west
side of Lake Drive at Aqua Lane. This eight -inch watermain stub should be
connected to the Marshan Lake Townhome water system to provide increased water
pressure, flow and system reliability (this will require jacking across Lake Drive).
Storm Sewer
1. The developer's engineer should provide OSM with the preliminary internal storm
sewer system calculations for review. The internal storm sewer system should
conform to the requirements of the City of Lino Lakes' Local Water Management
Plan. Some of the items listed in the Local Water Management Plan that will affect
the Marshan Lake Townhome project are listed as follows:
Ponding areas around urban construction shall be designed for the 100 -year,
24-hour, Type II rainfall distribution.
Minor drainage systems shall be designed using a 10 -year frequency rainfall.
The permanent pool volume in the sediment basin should be greater than or
equal to the volume of runoff from a 2.5 -inch rain storm. The sediment basin
located on the west side of Stagecoach Trail does not meet this requirement.
2. The spot elevations shown in the storm water outlet ditch, located along the north
property line, reflect backflow and will need to be revised.
3. The plan will need to be revised to provide adequate cover over the proposed storm
sewer line which drains from the 24 -inch Lake Drive culvert to the outlet ditch in the
park area along the north property line of the Marshan Lake Townhome Project.
4. Along with the reconstruction and widening of Aqua Lane, storm sewer will be
required to pick up surface runoff along Aqua Lane.
5. The grading shown for the driveway located on the north side of Block 12 will
require that storm sewer be constructed in this area to accommodate the storm water
drainage.
Streets
1. The main entrance into the Marshan Lake Townhome Project will be Aqua Lane.
Currently, Aqua Lane is a 24 -foot wide bituminous rural section roadway. This
section of Aqua Lane will not be able to accommodate the projected traffic demands
for the Marshan Lake Townhome Project. We recommend reconstructing the section
J:\5521.00\CIVIL\CORRES\092994.MKW
Ms. Mary Kay Wyland
Planning Coordinator
City of Lino Lakes
September 29, 1994
Page 3
of Aqua Lane from Lake Drive to Stagecoach Trail to a 48 -foot wide urban section
roadway. This section of road will then provide for the required turning movements
for the proposed business property at the intersection of Aqua Lane and Lake Drive,
and for the townhome residents at the intersection of Aqua Lane and Stagecoach
Trail.
2. This development proposes private streets for the internal roadway network. Private
streets are not allowed in a development zoned 11-4.
3. Surmountable curb and gutter shall be required within the development.
4. An additional five feet of right-of-way shall be required along the west property
boundary to allow for future construction along Lake Drive.
5. The driveway entrance and parking stalls for Block 11 of the Marshan Lake
Townhome Project are located in close proximity to Lake Drive. We recommend the
construction of a berm and screening between Block 11 and Lake Drive to prevent
a traffic hindrance on Lake Drive from this area.
6. We recommend that the proposed garage slab elevation be a minimum of 18 inches
higher than the adjacent street elevation. Several of the proposed driveways shown
on the grading plan are less than 18 inches above the adjacent street and should be
revised.
7. The existing contours should be shown on the exception area adjacent to Lake Drive
in -the area of the proposed two -foot retaining walls.
If you have any questions regarding the above comments, please contact ane at 595-5694.
Sincerely,
ORR-SCHELEN-MAYERON
& ASSOCIATES, INC.
Brian J. Bourassa, P.E.
Project Manager
,-c&L,AAA&
c: Kirk Corson, Hokanson Development, Inc.
Roger Nelson, R. Nelson Engineering
John Powell, Interim City Engineer, TKDA
Alan Brixius, Northwest Associated Consultants, Inc.
I:\5521.00\CIVIL\CORRES\092994.MKW
AGENDA ITEM V A
STAFF ORIGINATOR NAC - Al Brixius
DATE October 7, 1994
TOPIC PUBLIC HEARING —Woods of Baldwin Lake II
Preliminary Plat
EXECUTIVE SUMMARY
BACKGROUND
K -G Development has submitted a preliminary platapplicationfor
the Woods of Baldwirn Lake 2nd Addition to divide a 5.6 acre
property into 13 single family lots. The property is located in
the southeast corner of the intersection of White Pine Road and
Baldwin Lake Road, The property lies within the R 1X, Single
.Family Executive Residential District.
Attached for reference are the following exhibit
Exhibit A - Site Location
Exhibit B- Preliminary Plat
Exhibit C - Preliminary Grading, Drainage and Utility Plan
RECOMMENDATION
Based on the following review, our office recommends approval of
the Woods of Baldwin Lake 2nd Addition preliminary plat, subject to
the following conditions,
1. The Grading, Drainage, and Utility Plan is subject to review
and approval by the City Engineer and the Rice Creek Watershed
District_
2. Utility easements must be provided on the Final Plat, and be
at least 10 feet wide, centered on rear and other lot lines.
Said easements are also subject to review and approval of the
City Engineer.
5775 Wayzata BIS. • Suite 555 St. Louis Park, MN 55416 • (612) 5
9
36 -Fax. 595-9837
OCT -06-1994 12:06
NAC 612 595 9837 P.02/82
3. A11 building pad elevations must be at least 3 feet above the
high water level of the wetlands.
4. The applicant must make a cash contribution in the amount of
10 percent of the fair market value of the subject property to
satisfy the park dedication requirement.
5. The applicant shall enter into a development agreement with
the City.
6. Comments by other City Staff.
ISSUES ANALYSIS
Lot Sizes... The smallest lot within the proposed subdivision is
12,825 square feet in size, which meets the minimum lot size
requirement for lots within the R -1X Zoning District. Average lot
size within the development is 16,838 square feet.
In addition, all lots contain at least 12,825 square feet of land
above wetlands and/or flood plain elevations. Lot 4, Block 1, is
encumbered by a large wetland that is protected by a drainage
easement. This lot contains 15,400 square feet of land above the
wetland.
Lot Width. In the R -1X District, the minimum lot width requirement
is 90 feet_ The narrowest lot width proposed is 90 feet,
therefore, all of the proposed lots meet or exceed the requirement.
Lot Depth. Within the R -1X District, the minimum lot depth is 135
feet. Lot depths are measured by taking the average length of the
two side property lines, as homes are constructed typically in the
middle of lots. As such, all of the proposed lots meet the above
mentioned minimum requirements, as the shallowest lot is 135 feet
deep.
Setbacks. The following table illustrates the minimum setback
requirements within the R -1X Zoning District. The proposed
building pads on all proposed lots within the proposed Woods of
Baldwin Lake 2nd Addition, meet the minimum setback requirements.
Reautred R -1X Setbacks
Front Yard
Side Yard
Rear Yard
2
30 Feet
10 Feet
30 Feet
TOTAL P.02
OCT -06-1994 10:44 NAC
612 595 9837 P.04/07
Streets. Lots within the proposed subdivision will gain access
off of exiting White Pine Road and Baldwin Lake Road. In addition
Woodridge Lane will be extended from Woods of Baldwin Lake 1st
Addition, westward to connect with Baldwin Lake Road. The
developer will be responsible for construction of the extension,
which as proposed, meets the City's 60 foot minimum requirement for
right-of-way. The proposed roadway construction will improve
circulation in the area as Woodridge Lane will now become a through
street_
Park Dedication- The Lino Lakes Park Commission has reviewed the
proposed subdivision with regard to park dedication and recommended
that the developer make a park dedication contribution of cash in
lieu of land, in the amount of 10 percent of the fair market value
of the subject property.
Grath d Drainage/Wet1Ands. In accordance with subdivision
regulations, the applicant has submitted a grading and drainage
plan for review. All wetlands are to be protected with drainage
easements. In addition, all building pad elevations should be at
least three feet above the high water level of the wetlands. Said.
plan is subject to review and approval by the City Engineer.
Utility. Easements. The preliminary plat does not contain utility
easements, therefore, must be included on the final plat. Said
easements must be at least 10 feet wide, centered on rear and other
lot lines. Said easements are also subject to review and approval
of tree City Engineer.
Development Agreement. As a condition of preliminary plat approval
the applicant shall enter into a developers agreement with the
City.
CONCLUSION
Based on the preceding review, our office recommends approval of
the proposed preliminary plat for Woods of Baldwin Lake 2nd
Addition, subject to the conditions outlined herein.
cc: Mary Kay Wyland
Randy Schumacher
Rocky Goertz
3
OCT -06-1994 10:44
1,PC
612 595 9837 P.05/07
WORTH
1 MILE
CITY OF LINO LAKES
MINNESOTA
EXHIBIT A - SITE LOCATION
OCT -06-1994 10:45 MC
612 595 9837 P.06/07
EXHIBIT 8 - PRELIMINARY PLAT
2,0 1;1101
m wear,/
d �♦
WOODS OF BALDWIN LAKE 2ND ADDITION
C ILr of Lino Lake C.
r
1
e ' rdllMlt=Fii:
imelwem okAjth461.
!II6142MIM1.N1r 11Wmaantriad i+i4'44___
Le .,d.b,- viN.+rl 1. F6y
?1 s,p toilmApl. 1!14I Pm rasa
ti heal! 1Y ta.p rd.*, HIM Aa
it1 Sp 1I 4 0L 11agr1aw Quik 11MRta
G"V L I1h 10 hrirJmecl, MK ammed.ieme
d: .11Y441[a 1.p Awe meta pneza.p . ...NM.
lTJ f. MW IOWA LO KW 1177 M. ,l a7 WrT. met cam
•tp.c W'm«11oM
ACDRI01,'AL AREA
7RIBUTA Y TO DE TENT
Devil bp ar:
11.0 pivlupplent
70S! 4th A. Moe Lake*
Tif114-J11,
1
n. 14.4 1gRi, hrrd'r1Y W„ 117711..
I,..x.:
"midMP b,, Qrti lhob ILTe.d114
PMaki aM•t llsa r,
MMa WMI•. fn. ,.ai Iw4M iii v W LOA..
RY W 111 a 6, Nir1wa....0.w.l to ke1w.
1).NNNi1.b 1c7wmy 14 puMQ4 1. d'*4N...
1.1
`t. N. M1. Nir1.1 =NM
i.m ae Mtn MNii. a,. /2.41
4r.,1rl.rti.Pub>•.Mp iL4.r F
to xr RA. amos mum m pe& Imo. ea
.t
1MF 1..M,Tk. Nirr eaw 1ua...ry M.ixw
•., .Mw.tsni M....,LT., 1G
Mr 4 J..etme., frM2a.
r
1Y, Iw00MMM YON N. IW1.he Nide 416!1
t,,,,
laNNNO Oven NUN. ..ri;eb
d. t1.u.1iNl.lii ir1mti11m1nua n..l a,-wu♦
rER MENTATION POND
Efk7LET CfT1UL
I]rTI,ylra ft`dialit
tl.
iiiii4^ciriiNN INN NM 424 Meel.mme0 k, Fen erp11012 nML'
rW nm.f.Mlinr11Nf1, Ii
6 .nle.t.a b.g. D pNm..• lkep.M WM..aJ ma mime rdlt
.4IR11 nakeL Til .liaweu flute 44 ,. i4lr M1M.1:
rwap
Ams •.1-1111 io'.cvl CA' I'6M{ti" 11. x71
veld. r►1k114211..d_b Cr, WarvJ...1r dd.+t 1411
etm,.ea md.1,57per
A,16ri r.Hr kD'4'M.a M tIm Mt1.i lk aai k1 t2f v.cri.,pw T
kmrlamum a..+.1rer..•*!•lel,,CM.%k11.1,
whbrLaayp aura •0.S RI t:.l c0.
Tb rr,kq b V.V.eR n Mrm.. itmk. pty,''4 1 Per c.tu
Prparl q 1,.. ru. TM 4rag de ll/e NM rw,1:
7rmu,Me......a116,`Oenlepa [M - 1/1(..0e41-'11" 101k:1W
klmmkk k Ortr.3S.q DA.! •714..1.7 eG,IM 1004
.«n
t'.., 11p.a tat Q.17,M.4. ek, IC07Mt'=b e1
..;Nem
4.4.4 t... I4'611, T NW. 1 M'1'L, a I' M 4
14. ccmer4 mTW. hsrrikY.lr..i.. 4 K'Lur
IIx'.2:1,!1411: 47»..1a pve.I .r114Q1ur. term..
x4441 Leila A,. 3.1/:,
///,?,,V4
moikemme
/NrE Jff
ION"'
I i
0
LD
14
I-
u1
Q1
Fi
4L}
C11
elson Engineering
Mk 1g
Ia11 isHUT'Ix 41, 0474 a 14Ie 1PM. 4411 C.10 1 LU
Woods o1 Baldwin Lake and
Prelminary Grading, Drainage & tltllity 1
EXHIBIT C - GRADING & DRAINAC4E P1 AN
T .a
ENGINEERS - ARCHITECTS - PLANNERS
MEMORANDUM
To:
TOLTZ,. KIND, DUVALL, ANDERSON
AND ASSOC(ATE8, INCORPORATED
1600 P1PER JAFFRAY PLAZA
444 CEDAR trtMET
GF TT PAUL. MP $ 8RTAss1a1814O
PFHONE:61 iYZ92-4400 FAX.RT21292.G083
Mary Kay Wyland Reference: Engineering
Copies To: Woods onialdwin Lake
From: John Powell
2nd Addition
Lino Lakes - AWL
ltate: October 6. 1994 Commission No. 10414-943
We have reviewed the Preliminary Grading, Drainage and Utility Plan for the referenced subdivision
prepared by R. Nelson Engineering with the latest revision date of September 19, 1994. Our comments
are as follows:
Sanitary Sewer:
I . Sanitary sewer services are to be provided to all lots within the subdivision. Services should also
be extended to lots abutting the improvements which are buildable or already have houses built.
2. The existing house on Block 2, Lot 1, cannot be served by these improvements as it exists.
3. Areas near the upstream end of the proposed extensions will require insulation.
Watermain:
1. Water services are to be provided to all lots within the subdivision and to those lots abutting the
improvements which are buildable or have houses built
2. The watennain should be extended to the south edge of the plat along Baldwin 1 -Ake Road with a
hydrant placed at the end for flushing purposes.
Storm Sewer:
1. Drainage easements must be provided along the side and rear lot lines within Block 1
2 The City requires a minimum culvert size of 18", the pipe crossing Baldwin lake Road should
reflect this.
3. The discharge rare from the detention pond must be controlled. The impact of this discharge onto
the adjoining property must be determined.
4. Drainage computations and storm sewer design must be reviewed and approved by TKDA and the
Rice Creek Watershed District to verify compliance with applicable drainage requirements.
5. The silt fence placement locations for erosion control should be more clearly labeled.
Memorandum Page 2
6. Storm sewer pipe sizes, inverts, slopes, and materials are not shown.
7. The baffled weir on the sedimentation pond outlet needs to be tied into the embankment.
Streets:
1. The typical roadway section which shows the private utility placement locations is not current.
2. The curb grade on Baldwin Lake Road should be set to maintain the existing drainage patterns as
much as possible.
3. The homes along the north side of White Pine Road will particularly be affected by the roadway
construction due to their close proximity.
4. TKDA is currently developing a proposed alternative roadway section which would reduce the
impact on adjacent wetlands. If accepted by the City, it would be applicable to portions of both
Woodridge Lane and Baldwin Lake Road where curb installation is not a necessary part of the
storm sewer system
Miscellaneous
1. A neighborhood meeting with the property owners abutting the street and utility improvements
should be held to discuss the project in more detail, possibly including estimated assessments for
utility connection.
2. Some residents along the proposed extension of White Pine Road currently have Baldwin Take
Road addresses.
If you have any questions, please contact me.
JMP/mha
TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Planning & Zoning Board
Mary Kay Wyland
October 12, 1994
Misc. Planning & Zoning Items
- Item V C, Public Hearing for Hokanson Development - Marshan
Townhomes, has been withdrawn by the applicant. See attached
letter. This item will be reviewed by the P & Z at a later
date.
- We have had a request by Michelle
speak under Open Mike.
- The City has "frozen" building
development pending resolution
entrance to the subdivision.
Whitney, 7651 Lake Drive, to
permits to the Quail Ridge
of the dirt pile at the
- The Public Notice for the Woods of Baldwin Lake II plat
incorrectly stated that Woodcrest Avenue rather than Woodridge
Lane would be extended as a part of the plat. The incorrect
notice appeared in the paper and was corrected the following
week. The notification that went out to adjoining property
owners indicated the correct verbiage. The City Attorney has
determined that the public notice adequate.
- ADDITIONAL COMMENTS REGARDING ACCESSORY BUILDINGS:
The Building Inspector, Pete Kluegel, stated that "he backs
the existing Accessory Building Ordinance 100%". He would not
be in favor of a revision to that ordinance.
A telephone
Forest
survey today indicated the following:
Lake 1,500 sq. ft. total allowed, limit
of 1,000 sq. ft. per building
Forest Lake Twnshp Detached buildings limited to 1,000
sq. ft. (this does not include
attached garages). Limit remains
the same from 15,000 square feet up
to 10 acres.
Columbus Twnshp
Less than 2 1/2 acres = 1,800 sq.
ft. total if no attached garage. If
property contains attached garage
then the limit on detached is 1,200
sq. ft.
Northwest Associated Consultants, Inc.
URBAN PLANNING • D E S I G N • M A R K E T RESEARCH
MEMORANDUM
RECFilicry
SEP -
CITY ng• i !Mr 1 A VCQ
TO: Mary Kay Wyland
FROM: Dan Licht/Alan Brixius
DATE: 1 September 1994
RE: Lino Lakes - Accessory Building Ordinance
Review
FILE NO: 194.02 - 94.13
Background
Following a denial of a variance request, by Mr. Neil Banta, the
City Council at their 25 July 1994 meeting directed staff to review
the accessory building section of the Zoning Ordinance, in
particular Section 4, Subd. 7 (9) (G) which deals with accessory
building specifications for lots 32,671 acres to less than 11,4 acres
in size.
Attached for reference:
Exhibit A - Submitted Site Plan
Analysis
32,671 Square Feet to 1% Acre Ordinance. The current ordinance
regulating accessory building space for lots 32,671 square feet to
less than 11,4 acres in size allows for a total combined
attached/detached accessory building space of 1,100 square feet or
90% of the size of the house foundation, whichever is greater.
11/1 Acre to 2% Acre Ordinance. This ordinance applies only to
properties in rural districts. The provisions of this ordinance
allows for several detached structures, regardless of attached
accessory space. The ordinance allows for a maximum 800 square
foot storage building, plus a maximum 120 square foot tool shed,
plus a maximum 1,100 square foot detached garage provided no
attached garage exists. Therefore, the maximum combined accessory
storage allowed within this ordinance is 2,020 square feet.
5775 Wayzata Blvd. • Suite 555 • St. Louis Park, MN 55416 • (612) 595-9636•Fax. 595-9837
Space Allowance. The following figures are offered as reference
for the size requirements of several types of garages.
Square
Garage Type Dimensions Footage
Single car garage 24' x 12' 200
1-1/2 car garage 24' x 18' 433
2 car garage 24' x 24' 575
2-1/2 car garage 24' x 30' 720
3 car garage 24' x 36' 864
The current Lino Lakes Zoning Ordinance allows for 1,100 square
feet of accessory building space. Thus, the current standard would
allow for a three car garage plus an additional 236 square feet of
storage space. Staff believes that this is sufficient space for
urban residential purposes.
Banta Variance Request. This review of the accessory building
ordinance was prompted by a request for variance by Mr. Neil Banta.
Mr. Banta requested a variance from the accessory building
ordinance for 1 to 11,E acre lots. The variance was to allow the
expansion of accessory storage space from 1,328 square feet to
1,712 square feet. This additional accessory storage space was to
be the expansion of an existing 528 square foot attached garage to
a 912 square foot three car garage. Mr. Banta also has an 800
square feet detached storage building on the property. When this
home was built, the ordinance allowed for an 800 square feet
storage building and attached accessory space. This ordinance was
amended to the current standard in 1992.
The variance request was denied on the basis of no unique physical
hardship. However, the Planning Commission and City Council
instructed staff to review the ordinance to investigate possibly
enlarging the accessory building size requirements.
Comparison with Other Cities. Provided for comparison are the
following accessory building space allowances from several cities
with one acre residential districts. These figures are for a
combination of attached/detached accessory buildings.
City Maximum Allowable Space
Lino Lakes
Hugo
1,100 square foot maximum combined
attached/detached accessory building
space.
1,000 square foot attached garage space
plus 640 square feet of detached
accessory storage.
2
City Maximum Allowable Space
Lake Elmo
Circle Pines
1,000 square feet of combined
attached/detached accessory building
space.
1,000 square foot attached garage, plus a
maximum square footage of 15% of the rear
yard space as detached accessory storage.
Under these ordinances, only Circle Pines would allow the detached
accessory building space proposed by Mr. Banta. The existing 792
square foot accessory building is less than 15 percent of the
approximate rear yard based upon the following calculations.
The area of the rear yard must be estimated as staff did not
possess a detailed site plan to calculate the depth of the rear
yard. Staff assumed a house length of 40 feet, then added the 107
foot front setback, which was then subtracted from the total lot
depth. The approximate depth of the rear yard is 109 feet.
Therefore the approximate area of the rear yard is (109' x 185' lot
width) 20,165 square feet. Under the Circle Pines Ordinance, the
rear yard would be able to accommodate approximately a 3,025 square
foot building.
Suburban Area. The area in which these accessory building
standards are applied is generally Suburban, large lot residential.
It is the intent of the accessory building ordinance to maintain
this suburban character. As urban expansion continues and sewer
becomes available, it is expected that these large suburban lots
will be subdivided to accommodate the increased demand for land,
further urbanizing the area. An increase in the amount of
accessory building space, staff believes, is not in keeping with
the suburban character. In addition, increasing the amount of
accessory building space allowed might make future subdivision
difficult.
Summary
1. The 1,100 maximum square footage is sufficient to allow for a
three car garage plus a small detached accessory storage
building.
2. When compared with the accessory building ordinances of Hugo,
Circle Pines and Lake Elmo, only Circle Pines would allow the
accessory building space requested by Mr. Banta.
3
3. The area which these accessory buildings standards are applied
is generally suburban. However, it is expected that in the
future, sewer will be made available and that these large
suburban lots will be subdivided to accommodate increased
urban expansion. Therefore, any expansion of accessory
building space would not be in keeping with the expected urban
character of the area.
Recommendation
Based upon the previous summary, staff believes that the current
accessory building requirements are satisfactory and should not be
altered to increase the amount of accessory building space
permitted. Regardless of where the maximum accessory building
standard is established, the City will always receive applications
to extend the requirements.
Because staff believes this is a policy issue best decided by City
officials, our office offers the following options:
a. No policy change.
b. The expansion of the 11,( - 2% acre standard to include lots 1
to 1' acres in size.
c. Adoption of a new standard, similar to that employed by Circle
Pines, as outlined in this report.
Conclusion
Staff position with regards to this review of the accessory
building standard is that these areas are designated for future
urbanization and that any expansion of accessory building space
would be contradictory to this anticipated use. Staff believes
that the current ordinance standards allow for sufficient accessory
building space associated with suburban residential uses.
However, staff believes that this issue is a policy matter to be
determined by City officials. Therefore, staff offers several
options to consider which are outlined in the summary section of
this memorandum.
4
/4?
7c
/f
• • •
/7
2
/ A'
•
2C. 6. 75—
"
/o/ '2
tA
- r
,1
•
/(.
7
EXHIBIT A :1