My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/12/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
06/12/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 10:52:23 AM
Creation date
7/7/2017 1:34:04 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/12/1995
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Concept Cost Estimate <br />Brandywood Park <br />Design Concept Cost Estimate <br />for Brandywood Park <br />Item <br />Includes <br />Materials and <br />Installation <br />Site Vtbrk <br />Clear and grub <br />underbrush. <br />500.00 <br />General grading to level site for proposed <br />uses. <br />4,000.00 <br />Trail Development <br />6' and 8' asphalt trail through park and <br />hard surface play area (Phase I only). <br />17,500.00 <br />Play Structure <br />6" x 6" timber container (2 high x 360 LF) <br />3,600.00 <br />12" sand base <br />(125 CY) <br />1, 450.00 <br />Play and swing structure <br />22,000.00 <br />Site Amenities <br />Development <br />Picnic tables <br />4,000.00 <br />Site benches <br />2,100.00 <br />Horseshoe pit <br />600.00 <br />Half -court basketball <br />5,500.00 <br />Boardwalks <br />9,00000 <br />Seed/Sod and <br />Plantings <br />Naturalized plantings (trees and ground <br />cover). <br />5,000.00 <br />Sod high traffic areas <br />1,00000 <br />Seed manicured turf areas. <br />1,500.00 <br />Total <br />77, 750.00 <br />Cost Note: The above materials and installation costs are based on spring 1995 prices as supplied by <br />local contractors. Costs are also based on the assumption that negotiated contracts will be used for the <br />various work items (as opposed to a formal bid process). <br />City of Lino Lakes <br />1 <br />Brauer & Associates, Ltd #95-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.