Laserfiche WebLink
Design Concept Cost Estimate <br />Birch Park <br />Design Concept Cost Estimate <br />for Birch Park <br />Item <br />Includes <br />Materials and <br />Installation <br />Site Work <br />Clear and grub <br />underbrush. <br />500.00 <br />General grading to level site for proposed <br />uses. <br />2,000.00 <br />Trail Development <br />6' and 8' asphalt trail through park <br />15,000.00 <br />Play Structure <br />6" x 6" timber container (2 high x 550 LF) <br />5,500.00 <br />12" sand base <br />(240 Cl) <br />2, 800.00 <br />Play and swing structure <br />25,000.00 <br />Gazebo Overlook <br />Budget figure for covered structure <br />12,000.00 <br />Site Amenities <br />Development <br />Picnic tables <br />3,000.00 <br />Site benches <br />2,400.00 <br />Horseshoe pit <br />600.00 <br />Half -court basketball <br />5,500.00 <br />Exercise course <br />2,500.00 <br />Seed/Sod and <br />Plantings <br />Plantings (trees and ground cover). <br />10,000.00 <br />Sod high traffic areas <br />1,500.00 <br />Seed manicured turf areas. <br />5,500.00 <br />Total <br />93, 800.00 <br />Cost Note: The above materials and installation costs are based on spring 1995 prices as supplied by <br />local contractors. Costs are also based on the assumption that negotiated contracts will be used for the <br />various work items (as opposed to a formal bid process). <br />City of Lino Lakes 1 <br />Brauer & Associates, Ltd. #95-11 <br />