Laserfiche WebLink
III. BID PACKAGE 1 - BOILER REPLACEMENT ("A" BUILDING) <br />A. PROJECT DESCRIPTION <br />The work will consist of removal of an existing 300 HP boiler to be replaced with a new 500 HP <br />boiler/burner system, including replacement of an existing boiler feed water pump and existing <br />duplex fuel oil pumps. Use of #5 fuel oil will be eliminated. All work necessary to facilitate <br />removal and replacement of the boiler will be part of the project. <br />Page 40 <br />