My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/27/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
03/27/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2017 12:16:07 PM
Creation date
7/10/2017 2:25:35 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/27/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT Revised 1/5/95, 3/1/95, 3/24/95 <br />* Lot size requirement in unsewered area are delineated in Section 4, Subdivision 17 and <br />Section 6, Subdivisions 2 and 3. <br />** Lot area and width requirements along rivers in sewered areas and commercial zoning <br />districts in sewered areas will be delineated by the standards of the base zoning districts. <br />*** <br />Lot widths shall be measured at both the front building setback line and at the setback <br />from the ordinary high water level. <br />C. Additional Special Provisions. <br />1. Only land above the ordinary high water level of public waters and outside <br />existing watercourses can be used to meet the lot area standards. <br />2. The shoreland lot width standards must be met at both the ordinary high water <br />level and the building setback line. <br />3. All single family, two family, triplex, quadraminium, townhouse, commercial and <br />industrial subdivisions must provide a grading and drainage plan for review and <br />approval of the City Engineer and Rice Creek Watershed District. The grading <br />and drainage plan shall include: <br />a. Compliance for the impervious surface standards of the respective zoning <br />district. <br />b. The subdivision or lot development shall provide for the collection and <br />treatment of storm water in compliance with the Lino Lakes local Storm <br />Water Management Plan if determined that the site improvements will result <br />in increased runoff directly entering a public water. All grading and drainage <br />plans shall require review and approval by the City Engineer and the Rice <br />Creek Watershed District. <br />c. Measures to be taken for the treatment of storm water runoff and/or <br />prevention of storm water from directly entering a public water. The <br />measures may include, but not be limited to the following: <br />1. Appurtenances as sedimentation basins, debris basins, desilting basins or <br />silt traps. <br />2. Installation of debris guards and microsilt basins on storm sewer inlets. <br />3. Use where necessary, oil skimming devices or sump catch basins. <br />4. Direct drainage away from the lake and into pervious, grassed, yards <br />through site grading, use of gutters and downspouts. <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.