My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/11/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
09/11/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2017 12:12:38 PM
Creation date
7/10/2017 3:20:48 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/11/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM NO. 4A <br />STAFF ORIGINATOR: David Ahrens, City Engineer <br />DATE: 9/7/95 <br />TOPIC: Consideration of Resolution No. 95-109, Ordering the City Engineer to <br />prepare a Feasibility Report for an Elevated Water Storage Tank for the <br />Clearwater Creek Area: <br />BACKGROUND: <br />An elevated water storage tank is required to provide an adequate supply of <br />water to possible future commercial and residential developments in the <br />Clearwater Creek area. Currently, the Clearwater Creek housing development <br />will utilize a hydrostatic tank to maintain water pressure to the 150 proposed <br />homes. With the possibility of additional single-family homes in the Clearwater <br />Creek development and the possibility of substantial commercial or industrial <br />development in this corridor, the hydrostatic tank will not meet the water supply <br />demands of this new development. It is therefore necessary that the City <br />Council authorize the City Engineer to prepare a study for the construction of an <br />elevated water storage tank. The City's consulting engineer has quoted a price <br />of $950 to complete this study. <br />RECOMMENDATION: <br />1t is recommended that the City Council adopt the attached resolution <br />authorizing the City Engineer to prepare a feasibility report for an elevated water <br />storage tank. <br />
The URL can be used to link to this page
Your browser does not support the video tag.