Laserfiche WebLink
CITY OF CENTERVILLE <br />CITY COUNCIL <br />JOINT COUNCIL MEETING WITH <br />HUGO AND LINO LAKES <br />SEPTEMBER 14, 1995 <br />MEETING NOTES <br />The three councils got together to discuss the Joint Stormwater Comp Plan for Clearwater Creek <br />and also the 35E Intersection business expansion. <br />The Stormwater Comp Plan proposal would be to allow Clearwater Creek to.flow at a lower cfs <br />(cubic feet per second) constantly. The current peak discharge is 417 cfs and this would reduce it <br />by 30%, 275 cfs. They would put an additional, smaller culvert in at 35E. It would be placed <br />lower than the current one to allow the constant run of water through but at a slow pace. They <br />also want to widen the creek up from Lino Lakes and through Hugo to allow the storage ponds to <br />drain. <br />The funding would be from a storm drainage utility fund. The projected cost of the project is <br />$1,200,000.00 over a 10 year period. <br />This would allow utilization from the storage ponds without draining the increase rate of the <br />creek. The plan is how water can be best drained and utilized more effectively. <br />The proposal has been sent to Rice Creek Watershed Dist. (I forwarded a copy to Dave Nyberg, <br />MSA on September 19, 1995). Rice Creek has it currently tabled for more detailed information. <br />They have however, received comments of general support. <br />Because Clearwater Creek is considered a ditch, they are running into problems with complying <br />to ditch laws. <br />In summery, this proposal would allow Clearwater Creek to run at a constant slower rate allowing <br />the storage ponds also to drain. So when we get a week of rain yards, fields and streets will not <br />be flooded. <br />35E Clearwater Creek Business Area <br />Lino Lakes has the area around 35E and County Road 14 zoned as General Business and Light <br />Industrial. There is a Clearwater Creek Housing Development going in on the east side of 35E - <br />southeast of Centerville. <br />There business area study consists of: elevated water storage, sanitary sewer, storm sewer and <br />water mains. <br />Res.ectfully submitted, <br />Trudi Breuninger <br />Assistant City Clerk <br />City of Hugo <br />