My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/27/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
11/27/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2017 12:11:00 PM
Creation date
7/10/2017 4:17:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/27/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 9D <br />STAFF ORIGINATOR: David Ahrens, Public Works Director <br />DATE:11/22/95 <br />TOPIC: Receive Street Maintenance Guidelines <br />BACKGROUND: <br />The Charter Commission has requested that staff address street maintenance <br />issues as a result of the Charter Amendment being voted down at the election on <br />November 7, 1995. The attached sheet outlines maintenance efforts that are <br />typically done throughout the year and prioritize road patching. Typical street <br />maintenance measures include: <br />1. Sweep streets to remove sand and other debris (once in the spring and <br />summer and periodically throughout the summer) <br />2. Repair snow plow damage to yards <br />3. Crack filling <br />4. Seal coat roads <br />5. Install wear course in new developments <br />6. Patch roads <br />a) First priority will be given to roadways constructed to City <br />standards (post -1986) <br />b) Non-structural road failures such as block cracking, washboarding, <br />abrasion will be corrected with proper maintenance measure <br />c) Roadways in areas that likely will not be developed within 5 to 10 <br />years will receive proper maintenance measures as determined by <br />P.W. Supt. This includes the correction of subgrade failures <br />(removal of asphalt and subgrade and replacement with new hot <br />mix). <br />Roadways in areas that likely will be developed within 5 to 10 <br />years will receive proper maintenance measures as determined by <br />P.W. Supt. excluding the correction of subgrade failures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.