My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/27/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
11/27/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2017 12:11:00 PM
Creation date
7/10/2017 4:17:46 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/27/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL MEETING OCTOBER 23, 1995 <br />presented to the City to guarantee that the project will be completed. These financial <br />guarantees are retained by the City until the work is completed. <br />There were no other questions or comments regarding this assessment from the City <br />Council or the audience. <br />Woods of Baldwin Lake, 2nd Addition <br />The Woods of Baldwin Lake, 2nd Addition is located at the old termination of Woodridge <br />Lane in the southeast quadrant of White Pine Road and Baldwin Lake Road. This project <br />allowed for the completion of Woodridge Lane to Baldwin Lake Road and also for the <br />improvement of White Pine Road throughout the length of the project. Mr. Powell noted <br />that this is a City financed project. He used the overhead projector to show the location <br />of the project and noted that the assessments consist of sanitary sewer and watermain <br />lateral extension, street extension, Area and Connection Fund charges, and Surface Water <br />Management Fund charges. The total assessment of $203,387.08 will be spread over 13 <br />lots. <br />Mr. Powell noted that there was some deviation from the current street standards to allow <br />for construction of portions of the street to be installed without curb and gutter. This will <br />minimize the impact on the wetlands and reduce the amount of flow that is routed <br />through the storm sewer. This provides for maintaining the existing topography closer <br />with less disruption. <br />There were no comments or questions from the City Council or the audience. <br />Pheasant Hills Preserve, Gth Addition, Steve Heth <br />The Pheasant Hills Preserve, 6th Addition is located on the northeast portion of the <br />Pheasant Hills Preserve development. Mr. Heth used the overhead projector to show the <br />location of the project and noted that this improvement was developer financed. The <br />assessments include Area and Connection charges, seal coat and wear course charges and <br />Surface Water Management charges. The total assessment of $103,329.83 will be spread <br />over 19 lots. <br />There were no comments or questions from the City Council or the audience. <br />Pine Ridge, 3rd Addition <br />The Pine Ridge, 3rd Addition is connected to Pine Ridge, 2nd Addition and abuts the east <br />side of Ware Road. Mr. Heth used the overhead projector to show the location of the <br />project. This improvement is also a developer installed improvement. The assessments <br />consist of Area and Connection Charges and wear course charges and Surface Water <br />Management charges. The total assessment of $93,594.43 will be spread over 17 lots. <br />PAGE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.