My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/26/1995 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1995
>
06/26/1995 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 2:06:20 PM
Creation date
7/14/2017 9:40:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/26/1995
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TKDA <br />TOLTZ, KING, DUVALL, ANDERSON <br />AND ASSOCIATES, INCORPORATED <br />ENGINEERS , ARCHITECTS • PLANNERS <br />MEMORANDUM <br />Mary Kay Wyland <br />To: Planning Coordinator <br />1500 PIPER JAFFRAY PLAZA <br />444 CEDAR STREET <br />SAINT PAUL, MINNESOTA 55101-2140 <br />PHONE:612292-4400 FAX:612/292-0083 <br />Reference: Site Plan Review <br />Copies To: Alan Brixius, NAC Marshan Lake Condominiums <br />From: John Powell'?" <br />Lino Lakes, Minnesota <br />Date: May 5, 1995 Commission No. 10414-953 <br />As per your request, we have reviewed the site plan dated March 18, 1995 and revised April 19, 1995 for <br />the referenced site. Our comments are as follows: <br />Streets <br />1. The entire site is accessed exclusively via Lake Drive and Aqua Lane. Although Aqua Lane was <br />recently resurfaced it is substandard for the amount of traffic expected to be generated by the site. <br />Aqua Lane will require upgrading including storm sewer, to accommodate the turning movements <br />for this site as well as for any future business development on the northeast comer of Lake <br />Drive/Aqua Lane. The developer should be responsible for the cost of the required upgrading. <br />2. According to this site plan a cul-de-sac is proposed at the south end of Stagecoach Trail. This cul- <br />de-sac should be built along with the other site improvements. <br />3. All roadways within the subdivision are to be constructed to City standards including a 32' wide <br />(B -B) roadway and a 60' right-of-way. <br />Around the radiuses of the horseshoe the centerline slope will have to be increased to provide for a <br />minimum gutter line slope of 0.50%. <br />5. Similar to the Shores of Marshan subdivision, the developer will be required to dedicate additional <br />right-of-way along the east side of Lake Drive. The exact amount of this additional right-of-way <br />will be determined by MnDOT. <br />6. The access driveways to condominium No. 6, 8-11, are to be constructed to City Street Standards. <br />Sanitary Sewer <br />1. A feasibility study must be prepared to determine adequacy of the existing sanitary sewer system <br />and the impact on the system due to this development. A preliminary review has been prepared by <br />OSM for the developer which indicated the lift station at the south end of Stagecoach Trail would <br />need significant improvements to accommodate the flows generated by this development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.