AGENDA ITEU 7C <br />STAFF ORIGINATOR John Powell. TKDA <br />DATE <br />TOPIC <br />July 19. 1996 <br />BACKGROUND: <br />The bids for this project were received and publicly opened by the Clay on July 16, <br />1996. Three bids were received for the Fluted Column Style Tank which is the same <br />style as the existing tank near Apollo Drive and Fourth Avenue. The lowest the three <br />bids was from Pitt -Des Moines,. Inc. in the amount of $992,000 which is un r the <br />Engineer's Estimate of $1,155,000. Pitt -Des Moines, Inc. also it tailed the existing <br />tank. A copy of our recommendation of award is attached. <br />Consideration of Resolution No. 96-81 <br />Accepting Bids and Award Construction Contract for <br />glevated orage Tank No. 2 <br />Option No. 1 Approve Resolution No. 96-81 Accepting the Bids <br />Contract for Elevated Water Storage Tank No. 2. <br />