My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-05-2017 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2017
>
07-05-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 11:06:08 AM
Creation date
7/19/2017 4:54:09 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/05/2017
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Site Analysis and Space Needs Study24 <br />OptionA2 Layout <br />Pros <br />• Use of existing salt building <br />• Use of existing material storage Bins <br />• Use of existing miscellaneous site storage <br />• Use of existing cold storage garage <br />• Longer life-expectancy and reduced maintenance for an all new facility <br />• Large buildable area <br />• Drive through stalls for large vehicle storage parking <br />• Flexibility in building placement to best fit uses and site <br />Cons <br />• Cost of demolishing existing facility <br />• Disruption of operations during construction period <br />• Cost of bringing new water main to site for fire suppression requirements <br />• Loss of use of existing ice rink and cost to remove <br />• Loss of use of existing baseball field and cost to remove <br />• Cost of bringing municipal sanitary sewer to site (or impacts of large storage <br />tank and regular pumping for floor drains and wash bay sanitary) <br />Wetlands <br />Total Square Footage <br />• Remodel None <br />• New 79,503 s.f. <br />• Total 79,503 s.f. <br />• Existing Cold Storage 4,835 s.f. <br />Description <br />Option A2 is located at the current Public Works and Senior Center Facility site. This option provides for an all-new Public Works Facility which <br />includes office, vehicle maintenance, departmental shops and vehicle storage. The existing salt building, cold storage garage and material storage <br />bins will be reused. <br />Since this option removes the existing 45 year old building, it provides the flexibility to place the building on the site in a more advantageous layout. <br />This results in a more compact building footprint, better screening of the building to the east neighborhood, and the option for drive-through parking <br />for large equipment within the storage garage. This site option also allows for the continued use of the newer of the two existing cold storage <br />garages which will provide more available space for the Public Works department, especially until Phase 2 is added. Option A2, using the existing <br />public works site, requires an extension of the municipal water service and municipal sanitary service to the site.
The URL can be used to link to this page
Your browser does not support the video tag.