Laserfiche WebLink
ARCHI <br />T <br />E <br />C <br />T <br />S <br />PROJECT APPROACH <br />SUSTAINABILITY <br />The Project Team will provide recommendations for sustainable opportunities in the existing <br />city public works campus as well as any future facilities or sites. CNH has many years of green <br />building experience, with several awarded projects listed in our firm portfolio. We just recently <br />assisted the City of Roseville in utilizing the excess heat generated by the Ice Arena on their city <br />campus to fully heat the new Fire Station we designed for them, providing significant energy cost <br />savings. Creative approaches such as this will be evaluated for Lino Lakes, including initial cost <br />and payback analysis to assist you in making informed choices that best fit the goals and values <br />of the City. <br />OPTION ANALYSISAfter gathering all the information on space needs, evaluated the existing public works campus, and developed future needs based on expected growth; CNH will review three approaches for the City of Lino Lakes to meet their Public Works needs. These will include: <br />Option 1 – Renovate the existing building and expand to meet future needs. <br />Option 2 – Build an all new facility at the existing west site to provide long-term value. <br />Option 3 – Build an all new facility at the city property at Birch Street and Centerville Road leaving some appropriate elements at the existing west site. <br />The study will review each of the above options, analyzing and listing comparative data on each option in order to provide the City of Lino Lakes with the tools to make an informed decision on the future of the Public Works department facilities. Among others, the review of each option will include the following topics: <br />• Space needs – current and future <br />• Growth potential for each option <br />• Existing facility conditions <br /> ◦Deferred and short-term maintenance <br /> ◦Building code / OSHA compliance <br />• Accessibility compliance <br />• Energy usage and potential for savings <br />• Long-term costs of operation <br />• Capital costs for construction / remodeling proposed <br />• Site location relative to population and infrastructure <br />CITY OF LINO LAKES PUBLIC WORKS SPACE NEEDS ANALYSIS AND EXISTING FACILITY AUDIT 4